Name Tyler Graham Date 11/26/2018 Sec. # 503 Assign. 5 No. Description # L W H Takeoff Quantity U/M 1 Structural Slabs and Columns 2 3 4th Floor Structural Slab Concrete CF/LF Void 4 66" x 20" Pans -1 1932.000 8.935 -17262.42 CF 5 53" x 20" Pans -1 255.000 7.130 -1818.15 CF 6 30" x 20" Pans -1 249.000 3.933 -979.317 CF 7 20" x 20" Pan -1 18.000 2.544 -45.792 CF 8 10" x 20" Pan -1 56.000 1.155 -64.68 CF 9 Total -20170.359 10 Area 11 25" Slab assembly with 5" Slab and 20" void 1 18923 2.083 39416.609 CF 12 Total 19246.250 CF 13 14 15 Elevator Shaft 2 (10' - 2" x 8'-4 3/4") -1 10.167 8.396 2.083 -177.809 CF 16 Slab opening 5'-8" x 3'-0" -1 5.67 3 2.083 -35.432 CF 17 Slab opening 21'-6" x 9'-5" -1 21.5 9.42 2.083 -421.870 CF 18 Slab opening 2'-5" x 1'-7" -1 2.42 1.58 2.083 -7.965 CF 19 Slab opening 5' x 1'-7" -1 5 1.58 2.083 -16.456 CF 20 Mechanical Chase 21'-6" x 9'-1" -1 21.5 9.08 2.083 -406.643 CF 21 Total -1066.175 22 23 24 Total CF Concrete 18180.075 CF 25 Convert to CY (CF/27) 673.336 CY 26 Add waste @3% 693.54 CY 27 Total CY 4th Floor Suspended Structural Slab Concrete 694 CY 28 29
Name Tyler Graham Date 11/26/2018 Sec. # 503 Assign. 5 No. Description # L W H Takeoff Quantity U/M 30 31 32 33 Column Concrete 34 Third Floor 35 Column 1.3/B 18" x 18" (1031.0-1015.0) 4 1.5 1.5 16 144.000 CF 36 Column 1.4/C.4 24" x 24" (1031.0-1015.0-2.083) 3 1.5 1.5 13.917 93.940 CF 37 Column 1/D, 1/E, 1/F, 1/G, 1/H 24" x 24" (1031.0-1015.0-2.083)

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture