SPARC Enterprise M3000 Server Getting Started Guide.pdf - SPARC Enterprise M3000 Server Getting Started Guide This guide describes the minimum steps you

SPARC Enterprise M3000 Server Getting Started Guide.pdf -...

This preview shows page 1 - 3 out of 6 pages.

1 This guide describes the minimum steps you must perform to power on and boot your server for the first time. Before installing the SPARC Enterprise M3000 server, check for late-breaking information about patches and known issues. Information found in the SPARC Enterprise M3000/M4000/M5000/M8000/M9000 Servers Product Notes supersedes the information in this document. Detailed installation information can be found in the SPARC Enterprise M3000 Server Installation Guide , which is available at the documentation web site: Safety and Compliance Information Before performing an installation, refer to the following documents for safety information regarding the SPARC Enterprise M3000 Server : Important Legal and Safety Information – Printed document included in the ship kit. SPARC Enterprise M3000 Server Safety and Compliance Manual – Available online at the documentation web site. Prepare the Site for Installation 1. Verify power, air conditioning, and floor area requirements. See the SPARC Enterprise M3000 Server Site Planning Guide. 2. Check the delivered items against the “LIST OF ATTACHMENT” that came with the server. Register the System 1. Locate the serial number for your system or the customer information sheet that came with the system. 2. Go to the following web site to register your system: SPARC Enterprise M3000 Server Getting Started Guide
Image of page 1
2 Install Optional Components Before installing the server into the rack, you must first install any optional components that you ordered with the server, such as DIMMs, PCIe cards, and so on. Refer to the SPARC Enterprise M3000 Server Service Manual for the instructions on installing optional components. Mount the System In a Rack For rackmounting instructions, refer to the instructions in the SPARC Enterprise Rack Mounting Guide (online) and the Rail Kit Instructions which ships with the rails. Installation Steps for the SPARC Enterprise M3000 Server For quick installation and configuration, follow these steps. For more detailed information, see the SPARC Enterprise M3000 Server Installation Guide . Caution – Make sure that the AC power source circuit breaker is in the OFF position before connecting the AC power cords. Connect the Cables 1. Connect the power cords to the power supply units on the rear panel of the server.
Image of page 2
Image of page 3

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture