Problem_set6_-_solutions

Problem_set6_-_solutions - EC201 Introduction to...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Spring 2008 1 Name:_______________________ Student Number:_______________ Problem set # 6 (Due on Tuesday 02/26/2008, by 12:40pm) Please staple all the pages together. Circle the most appropriate answer to the following questions (each question is worth 1 point): 1) Refer to the Table above. Each worker at Gallo's cork factory costs $12 per hour. The cost of each machine is $20 per day regardless of the number of corks produced. What is the total daily cost of producing at a rate of 55 corks per hour if Gallo’s operates 8 hours per day? a. $480 b. $576 c. $520 d. $616 ANS: C 2) Refer to the Table above. Each worker at Gallo's cork factory costs $12 per hour. The cost of each machine is $20 per day regardless of the number of corks produced. Assume the number of machines does not change. If Gallo's produces at a rate of 78 corks per hour, what is the total machine cost per day? a. $20
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/30/2008 for the course ECON 201 taught by Professor C.liedholm during the Spring '07 term at Michigan State University.

Page1 / 3

Problem_set6_-_solutions - EC201 Introduction to...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online