RFI_M&E_042.pdf - (36219-P Syarikat Success Construction Sdn Bhd Office 142 Jalan Seang Tek 10400 Penang Malaysia Tel 604-2296888(H.L Fax

RFI_M&E_042.pdf - (36219-P Syarikat Success Construction...

This preview shows page 1 out of 1 page.

RFI No. Issue Date Date Required : Acknowledgement of Receipt: : Signature : : Sean Chan Name : : M&E Engineer Designation : Variation Order Dayworks Remeasurement Others : : : Date: Post Hand Email CC Attn : x CC SA.LEE ARCHITECT PLANNER Attn : x CC Attn : x CC Attn : x UNITECH QS CONSULTANCY SDN BHD Ms Jesse / Ms SZ Khor JURUTERA MTC SDN BHD Ir Ooi CL / Ir GN Yeap Ar. SA Lee Position Courier Fax KAY PRIDE SDN BHD Ir Tang Song Teik / Mr Lee WC RESPONSE Attachment: Yes/No* Response: Signature Name Thank you. Requested By Sean Chan Signature Name Designation INFORMATION REQUIRED Attachment: Yes/No * Cost Implication: Yes/ No Main Building: Level 7 Barbeque Deck Cold Water , Waste Pipe System & Electrical Point Refer to the above mentioned matters ; We would like to require the details drawing for the Cold water ,waste system and electrical point at the Barbeque Deck as per discussion during the last Landscape coordination meeting dated 27/April/2018. Attach herewith the indicated drawing layout and landscape layout for your further action and perusal.
Image of page 1

You've reached the end of your free preview.

Want to read the whole page?

  • Summer '15
  • Mr Fawn

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture