METHOD STATEMENT FOR HACKING 1. Clean up the surface of proposed Hacking area at wet riser room 2. Marking Hacking area for Pipe Sleeve Dia 8” and Square Pocket (16” Square) 3. Probing at the bottom(Soffit) of the Slab 4. Cut the Square pocket with Grinding as per marking at step 2 above without cutting reinforcement Iron Bar in the concrete 5. Hack thru the square marking area and clean up loose concrete material 6. Install Form work at the bottom of Slab(Soffit) under hacked square pocket 7. Insert Pipe Sleeve