ACQ 101_Model 14.docx - 1 Which of the following metrics...

  • No School
  • AA 1
  • lilv2128
  • 1
  • 100% (17) 17 out of 17 people found this document helpful

This preview shows page 1 out of 1 page.

1) Which of the following metrics are the top-level outcome-based metrics based on the Joint Capabilities Integration and Development System (JCIDS)? Availability Sustainment Accessibility Cost per unit usage 2) Developing support outcomes and capturing them in a Performance Work Statement (PWS) is a foundational effort in establishing properly structured Performance Based Logistics (PBL) contracts.
Image of page 1

You've reached the end of your free preview.

Want to read the whole page?

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture