Steelco_Transport - =Sheet1!$B$18:$D$18 Plant 1 $60 $40 $28...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
STEELCO Steelco mnufactures three types of steel at different plants. The time required to manufacture one ton of steel (regardless of type) and the costs at each are shown in the table. Each week, 100 tons of each type of steel (1,2 and 3) must be produced. Each plant is open 40 hours per week. Determine how to minimize the cost of meeting Steelco's weekly requirements.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Problem 4.4 Problem 5.4 Range names Available =Sheet1!$G$13:$G$15 Cost/ton of steel at each plant Produced =Sheet1!$B$13:$D$15 Steel 1 Steel 2 Steel 3 Minutes/ton Required
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: =Sheet1!$B$18:$D$18 Plant 1 $60 $40 $28 20 TotCost =Sheet1!$B$20 Plant 2 $50 $30 $30 16 TotProduced =Sheet1!$B$16:$D$16 Plant 3 $43 $20 $20 15 Used =Sheet1!$E$13:$E$15 Hours each plant is open 40 Tons produced at each plant Steel 1 Steel 2 Steel 3 Minuted used Minutes available Plant 1 40 800 <= 2400 Plant 2 100 1600 <= 2400 Plant 3 100 60 2400 <= 2400 Total 100 100 100 >= >= >= Required 100 100 100 Total cost $9,320 A B C D E F G H I J K L 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20...
View Full Document

Page1 / 2

Steelco_Transport - =Sheet1!$B$18:$D$18 Plant 1 $60 $40 $28...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online