Class_50.discussion.for.ppj. - CE 321 Class Overview March...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
CE 321 Class Overview March 19, 2009 Last Class -2-Lane Highways 2 LOS Measures Consider 2-way analysis only Example Today Course syllabus revisions Review of freeway, multilane and shockwave cases Next Class Traffic Signals CE 321 Spring 2009
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
32 Th 4/2 Mid-Term #2 33 F 4/3 Laboratory #11 34 T 4/7 Class Notes Review Highway Capacity and analysis methods 35 Th 4/9 MKW 7.1 – 7.3 Class Notes Signalized Intersections Hmwk 8 Due 36 F 4/10 Laboratory #12 37 T 4/14 MKW 7.4 – 7.5 Class Notes Signal Timing 38 Th 4/16 Class Notes Signal Timing 39 F 4/17 Laboratory #13 Lab Land Desktop Project Due 40 T 4/21 MKW 8.1 – 8.5 Class Notes Transportation Planning/Trip Generation 41 Th 4/23 MKW 8.6 Class Notes Mode Choice Hmwk 9 Due 42 F 4/24 Laboratory #14 43 T 4/28 Class Notes Traffic Assignment 44 Th 4/30 Class Notes Transportation Planning and Modeling Overview 45 F 5/1 Laboratory Wrap-up Lab Assignment 4 Due Final Exam May 5 Revised Syllabus
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 06/08/2009 for the course CE 321 taught by Professor Petrucha during the Spring '02 term at Pennsylvania State University, University Park.

Page1 / 10

Class_50.discussion.for.ppj. - CE 321 Class Overview March...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online