Running head: UNIT VIII COURSE PROJECT1Unit VIII Course ProjectChris Nossett216580
UNIT VIII COURSE PROJECT2Executive SummaryThe fire that occurred at the City of Washington Distribution Warehouse could have beenprevented if the right measures were taken.However the fire did happen which resulted in a lotof damage.The fire suppression system that was installed in the warehouse was not sufficientenough to meet the requirements of the products being stored within.The fire suppressionsystem that was installed probably met the requirements of the building prior to the renovation.The building renovation should have been designed around an updated fire suppression system.The fire suppression system should have been completely upgraded, from the fire pumpto the sprinkler system.The fire alarms should have been both automatic and manual.TheFACU that should have been in place would have all the types of notification appliances(audible, visual, textual).The original fire pump should have been replaced with a dieselpowered pump.

Upload your study docs or become a

Course Hero member to access this document

Upload your study docs or become a

Course Hero member to access this document

End of preview. Want to read all 5 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Fall
Professor
N/A
Tags
Control Engineering, Fire protection, Fire sprinkler, Surge Protector, smoke control systems

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture