OSH 4308 Unit IV Project .docx - Running head OSH 4308 Unit IV Project OSH 4308 Unit IV Project Travis Painter Columbia Southern University 1 OSH 4308

OSH 4308 Unit IV Project .docx - Running head OSH 4308 Unit...

This preview shows page 1 - 5 out of 12 pages.

Running head: OSH 4308 Unit IV Project OSH 4308 Unit IV Project Travis Painter Columbia Southern University 1
Image of page 1
OSH 4308 Unit IV Project OSH 4308 Unit IV Project Acme Manufacturing Co. has contracted Be Safe Consulting Inc. again to conduct another evaluation on the hazardous noises that that employees are susceptible to during their day of work. The first portion of this report is evaluating the machine shop #1 and the employee’s individual exposures. Machine Shop #1 Stationary Grinding Wheel (Robert Jones): Sample 1: T 1 = 8 2 ( 83 90 5 ) T 1 = 8 2 1.4 T 1 = 8 0.378 T 1 = 21.62 hours x 60 minutes = 1,297.2 minutes D = 100 [ 90 1,297.2 ] D = 100 [ 0.069 ] D = 6.93% Sample 2: T 1 = 8 2 ( 91 90 5 ) T 1 = 8 2 0.2 2
Image of page 2
OSH 4308 Unit IV Project T 1 = 8 1.15 T 1 = 6.95 hours x 60 minutes = 417.39 minutes D = 100 [ 125 417.39 ] D = 100 [ 0.299 ] D = 29.94 % Sample 3: T 1 = 8 2 ( 83 90 5 ) T 1 = 8 2 1.4 T 1 = 8 0.38 T 1 = 21.05 hours x 60 minutes = 1,263.15 minutes D = 100 [ 265 1,263.15 ] D = 100 [ 0.2097 ] D = 20.97% Drill Press # 4 (Clara Tucker): Sample 1: T 1 = 8 2 ( 89 90 5 ) T 1 = 8 2 0.2 3
Image of page 3
OSH 4308 Unit IV Project T 1 = 8 0.870 T 1 = 9.19 hours x 60 minutes = 551.72 minutes D = 100 [ 135 551.72 ] D = 100 [ 0.244 ] D = 24.46% Sample 2: T 1 = 8 2 ( 79 90 5 ) T 1 =
Image of page 4
Image of page 5

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture