Final Exam Fall 2006

Final Exam Fall 2006 - Standard time is the amount of time determined by the engineer as required for performing A task B element “Utilization”

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
Fall 2006 T. E. Lockhart ISE 3014 – EXAM EXAMPLES Examination guidelines: Part I: Closed book / closed notes Part II: Opened book / opened notes Use complete sentences to respond to narrative questions. Use the space provided to answer questions. Please write legibly. Note the weighting on the various problems. Problem 1 2 3 4 5 6 Total Points 20 12 15 20 20 13 Actual Pledge: I neither gave nor received any unauthorized information on or about this examination. (Signature)
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Part I: Closed Book/Closed Notes 1. True or False examples a. Work measurement is analysis and work methods is design b. Disadvantage of the continuous method of watch recording is that it can not immediately tell elemental time c. Allowances are adjustment of the standard time to compensate unavoidable delays 2. Multiple Choice examples
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Standard time is the amount of time determined by the engineer as required for performing; A. task B. element “Utilization” is defined as; A. Total amount of production time/production time of a single unit B. actual working time spent by the worker/worker’s capacity 3. Define and Describe examples Describe how you would determine the recommended number of cycles for a time study. You Must turn in Part I before beginning Part II. Part II: Open Book example 4. Fifteen cycles were observed and the data below was tabulated for a three element task . Given: 95% confidence, what would be the (one) accuracy associated with the study you will use? (20 points) Element Rating Average St Dev 1 90 1 0.31 2 110 8 1.75 3 95 3 0.59...
View Full Document

This note was uploaded on 04/01/2008 for the course ISE 3014 taught by Professor Telockhart during the Fall '08 term at Virginia Tech.

Page1 / 4

Final Exam Fall 2006 - Standard time is the amount of time determined by the engineer as required for performing A task B element “Utilization”

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online