CSM – 702 Assignment 3 WBS and Activity list for 80 centre street Group members - Memoh gaba 301066886 Gurdeep Singh 301083472 Naresh kumar 301089605 Sarabjeet singh 301091579 Harshit 301091146 Nimish khanal 301087602 Wood Frame House at 80 Centre St. Substructure Superstructure
Image of page 1
LIST OF ACTIVITIES Foundation Foundation rough grading Excavation Levelling Dewatering Footings Piers Anchored bolt Formwork Gaskit Backfilling Drainage Damproofing Structure Structure Subfloor Fornwork Beams Bearing wall Moisture Protector Stairs Railing Truss Roofing F F
Image of page 2
EXCAVATION- The process of removing the top soil for the foundation of building with the help of excavation machine and tools LEVELING- To make the ground smooth for the footing work DEWATERING- To remove the water from the ground RETAINING WALLS- The walls which are used to suppor the soil in the foundation FRAME WORK- It is making a mould for laying of footing slabs CONCRETE POURING- The process of filling concrete in the moulds ANCHORING- providing re-bars