bbap2103_s3.pdf - BBAP2103(SAMPLE 3 PART A BAHAGIAN A...

  • No School
  • AA 1
  • 10

This preview shows page 1 - 4 out of 10 pages.

BBAP2103 (SAMPLE 3) 1 PART A / BAHAGIAN A INSTRUCTIONS / ARAHAN Part A contains FIVE questions. Answer ALL. Bahagian A mengandungi LIMA soalan. Jawab SEMUA. QUESTION / SOALAN Marks / Markah 1. Explain two main features of process costing. Terangkan dua ciri utama pengekosan proses. (4) 2. Explain what is meant by the margin of safety in cost-volume-profit analysis and why this information is important to the management of a company. Terangkan apa yang dimaksudkan dengan margin keselamatan dalam analisis kos volum-untung dan mengapa maklumat ini penting kepada pengurusan sesebuah syarikat. (4) 3. Describe the difference between an operating budget and a financial budget. Huraikan perbezaan antara belanjawan kendalian dan belanjawan kewangan. (4) 4. Explain why ideal standard costs are not widely used among companies. Terangkan mengapa kos piawai ideal tidak digunakan dengan meluas di kalangan syarikat. (4) 5. Identify the steps that need to be taken in decision making. Kenal pastikan langkah-langkah yang perlu diambil dalam pembuatan keputusan. (4)
Image of page 1
BBAP2103 (SAMPLE 3) 2 PART B / BAHAGIAN B INSTRUCTIONS / ARAHAN Part B contains THREE questions. Answer TWO ONLY. Bahagian B mengandungi TIGA soalan. Jawab DUA SAHAJA. QUESTION / SOALAN 1 Marks / Markah UTC Bhd. manufactures quality health products. The ingredients are combined in the mixing department and transferred to its packaging department. The following information pertains to the mixing department for the month of June: Units (Gallons) Work in process, June 1 (100% complete materials, 75% complete labour and overhead) 10,000 Started during June 50,000 Work in process, June 30 (100% complete materials, 50% complete labour and overhead) 8,000 The costs in work in process at June 1 in the mixing department were as follows: Mixing Department Work in process, June 1: Materials RM15,000 Direct labour 20,000 Manufacturing overhead 17,600 Total costs RM52,600 The costs added by the mixing department during the month of June were as follows: Mixing Department Materials RM 90,000 Direct labour 120,000 Manufacturing overhead 100,000 Total costs added RM310,000 Required: a) Prepare a physical flow (quantity) schedule for the mixing department for June. (5) b) Using the weighted average method, determine the equivalent units of production for materials and conversion costs for the mixing department for June. (4) c) Using the weighted average method, determine the cost per equivalent unit of production for materials and conversion costs for the mixing department for June. (6) d) Using the weighted average method, determine the cost of goods transferred out and the cost of ending work in process for the mixing department. (5) (Total / Jumlah : 20)
Image of page 2
BBAP2103 (SAMPLE 3) 3 UTC Bhd. Mengeluarkan produk kesihatan bermutu. Bahan-bahan digabungkan di jabatan campuran dan dipindah ke jabatan pembungkusannya.
Image of page 3
Image of page 4

You've reached the end of your free preview.

Want to read all 10 pages?

  • Fall '19

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask You can ask (will expire )
Answers in as fast as 15 minutes
A+ icon
Ask Expert Tutors