Las Vegas Shooting presentation.pptx - PROJECT PLAN...

  • No School
  • AA 1
  • 13

This preview shows page 1 - 5 out of 13 pages.

PROJECT PLAN Presented By: Student Name Course Date:
Image of page 1
Introduction Drawbridge Properties Limited is a company that consists of a small team of professionals who provide property services. Some of the services the company offers are planning, plumbing and heating, property maintenance, extensions and conversion services. Also, the company owns a large number of properties in the United States, especially in New York, Washington DC, Las Vegas and Los Angeles. The headquarter of the company is in New York. The company want to expand their business and connect all their property to the network infrastructure, they intend to improve their network infrastructure and database management system
Image of page 2
Scope of the project The primary scope of the project will be to: upgrade the network hardware, improve the connection capacity, security enhancement and improving the customer experience. First, the scope of upgrading the network hardware will be to replace the old equipment and install fibre optic cables that will be connecting every office. Second, the range of improving the connection capacity will be to increase the internet data rate from 2mbps to about 1gbps. The customer experience will be enhanced by setting up a fibre-optic connection to the database. Also, every office opened will be installed with Wi-Fi access points. Furthermore, the project scope will include purchasing a public cloud platform that will enable the company to manage big data, especially by setting up a Software as a service (SaaS). The importance of the Software as a Service is that it will help Drawbridge Properties Limited to manage analytics.
Image of page 3
Control Measures The primary control measures that will be implemented is that the site for data storage will be distributed across various location in the US. Second, after the implementation of the project, a test will be conducted first to check that the information system is working correctly. A test conversion will be done before the turnover of the project. Lastly, a training session will be conducted on all the staff to educate them on how to operate the information system.
Image of page 4
Image of page 5

You've reached the end of your free preview.

Want to read all 13 pages?

  • Fall '19

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask You can ask (will expire )
Answers in as fast as 15 minutes
A+ icon
Ask Expert Tutors