PUBLIC SECTOR STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION WORKS (Seventh Edition July 2014) SUPPLEMENT CONTENTS 1. APPENDIX 2. FORM OF TENDER 3. AGREEMENT 4. FORM OF SECURITY DEPOSIT GUARANTEE 5. FORM OF ADVANCE PAYMENT GUARANTEE Form of Tender and Agreement was revised w.e.f. 01/10/18. Form of Security Deposit Guarantee was revised w.e.f. 18/07/17 to replace existing specimen for Performance Guarantee. Form of Advance Payment Guarantee was added w.e.f. 01/04/18 for projects requiring Option Module D. Appendix was revised w.e.f. 01/04/18 to incorporate items required under Option Module D.
Image of page 1

Subscribe to view the full document.

Refer to the List of Clarifications and Editorial Amendments for PSSCOC for Construction Works 2014 for revisions / additions made. APPENDIX
Image of page 2
APPENDIX CLAUSE OPTION MODULES 1.1(c) ............................................................ EMPLOYER 1.1(m) ............................................................ LIMITATIONS ON THE AUTHORITY OF THE SUPERINTENDING OFFICER 2.1 ............................................................ ............................................................ SECURITY DEPOSIT 4.5(1) Number of days to deposit after Letter of Acceptance (14 days if none stated) ……………………………………... Amount ........................................................... TIME FOR COMPLETION 14.1 Whole of the Works ............................................................ Phase or Part of the Works ............................................................ ............................................................ ............................................................ ............................................................ ............................................................ ............................................................ LIQUIDATED DAMAGES 16.1 (The cumulative amount of liquidated damages payable by the Contractor for all occasions of delay under the Contract shall not exceed $50m or the Contract Sum, whichever is lower.) Whole of the Works ............................................................ Phase or Part of the Works ............................................................ ............................................................ ............................................................ ............................................................ ............................................................ ............................................................
Image of page 3

Subscribe to view the full document.

CLAUSE DEFECTS LIABILITY PERIOD 18.1 ............................................................ (12 months if none stated) LIMITATIONS ON EXTENT OF LIABILITY FOR ANY ONE ACCIDENT 27.1(1)(b) ............................................................ PERCENTAGE OF PROFESSIONAL FEES 28.1(1) ............................................................ PERIOD FOR HONOURING CERTIFICATE 32.6 ............................................................ (21 days if none stated) RATE OF INTEREST UPON UNPAID SUMS 32.6 ............................................................ FLUCTUATIONS 33.1 Specified Materials Concrete Steel Reinforcements Tender Closing Month ........................................................... Base Unit Rate of Materials (to be filled in by bidders)* Concrete $ .................................................... /m 3 Steel Reinforcements $ .................................................... /tonne ADVANCE PAYMENT** D1.0(2) ....... % of the PPVC costs, capped at .......
Image of page 4
(if not stated, it shall be 20 % of the PPVC costs priced by the Contractor up to 10% of the Contract Sum) % of Contract Sum RECOVERY PERIOD** (within 12 months after the recovery start date if none stated) D2.0(1) / D5.0 ....... months INTERVALS FOR REPAYMENT OF THE ADVANCE PAYMENT** (monthly if none stated) D5.0 …………………………….. RECOVERY START DATE** (4 months after the date of the Letter of Acceptance if none stated) D5.0 ....... months after the date of the Letter of Acceptance * To delete accordingly ** To delete unless Option Module D is used
Image of page 5

Subscribe to view the full document.

FORM OF TENDER
Image of page 6
FORM OF TENDER (w.e.f. 01/10/18) NAME OF CONTRACT: * .......................................................................................................... .......................................................... …… ..................................................................................... TO:* ........................................................................................ …… ............................................... ...................................................................................................... …… ......................................... ............................................................................................................ …… ................................... Gentlemen, 1. 1. Having examined the Tender Documents comprising: (a) the Instructions to Tenderers (b) the Conditions of Contract comprising (i) the Standard Conditions (ii) the Particular Conditions ................................................ (iii) the Appendix; (c) the Specifications; (d) the Drawings; (e) the Bills of Quantities/Schedule of Rates*; and (f) the Addenda Nos ................................................ for the execution of the above-named Works, we, the undersigned offer and undertake, on your acceptance of this Tender Offer, to design (to the extent provided for in the Contract), execute, and complete the Works, and remedy any defects therein in conformity with the Conditions of Contract,
Image of page 7

Subscribe to view the full document.

Image of page 8
  • Fall '17

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Ask Expert Tutors You can ask 0 bonus questions You can ask 0 questions (0 expire soon) You can ask 0 questions (will expire )
Answers in as fast as 15 minutes