TASK 2 Practical Activity.pptx - Introduction Pty Ltd Construction work means Renovation repair maintenance Refurbishment Demolition dismantling of a

TASK 2 Practical Activity.pptx - Introduction Pty Ltd...

This preview shows page 1 - 9 out of 30 pages.

Introduction Pty Ltd Construction work means: Renovation, repair, maintenance Refurbishment Demolition, dismantling of a structure Employs more than 100 workers Establish, implement, maintain and evaluate a WHS management system 1
Image of page 1
WHS management system Procedures developed for the system Implementation plans developed Actions performed for maintenance of the system Methods to monitor and evaluate the system 2
Image of page 2
Procedures developed for WHS System Induction All workers must have WHITE CARDS to work on KP construction site Ensure aware of site safety rules of high risk construction work hazards. Safe operation of all machinery equipment Workers must be licensed to carry out high risks construction works For example scaffolding, cranes, concrete placement units with forklifts. Personal Protective Equipment(PPE) All workers must bring their own protective footwear, high visibility clothing, eye wear /ear plugs, hard hats 3
Image of page 3
Procedures developed for WHS System First aid procedures A first aid equipment is provided in the workplace for all workers Only having FIRST AID cards can access our equipment Worksite emergency evacuation procedures Notify workers about the emergency point and emergency procedures. For example testing fire extinguishers, preparing and displaying an emergency contact list. 4
Image of page 4
Implementation plans for WHS System This can create a safe workplace Elements of WHS management plan Workplace Activities Control Measures Timeframe Responsibilities Benefits 5
Image of page 5
KP Construction Implementation plans template 6
Image of page 6
Actions performed for the maintenance of the WHS System Consultation This action ensures the safety of everyone on site. For example you will consult with all designers, workers, PCBUs involved, all suppliers to coordinate maintenance activities and ensure the safety of everyone on the site. communication This action is involved on site formally and informally to ensure all workers comply with their WHS duties and to keep them informed of any hazards or risks that arise. For example, through induction, toolbox meetings or verbal reports from accident or incident investigations. Design a safety report/record keeping This action must specify hazards that may create risks before doing maintenance works. Replace old ones with new 7
Image of page 7
Methods used to monitor and evaluate the WHS System Inspection Regularly check all equipment and tools to ensure that they are well maintained and safe to use. Also check storage areas and review safe work procedures. Audits The accredited auditor (construction) considers the evidence that is available at the time to assess whether the practices detailed in the WHS management plan conform to the set criteria on construction site are undertaken.
Image of page 8
Image of page 9

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture