Unformatted text preview: 5 Breaks immediately when placed on the testing block Bridge Information: Load held: Mass of bridge: Length of bridge: Width of bridge: Height of bridge: Engineering Efficiency: Engineering Efficiency (15 points) The efficiency of each bridge will be calculated by dividing the live load (weight carried) by the dead load (weight of the bridge). Substitute the LOAD in grams in the formula (below) and substitute the MASS OF THE BRIDGE in grams in the formula (below). Divide the LOAD by the MASS. There are no units for this rating. (Show your work and results below). E = Efficiency = Load = ____________ = Mass of Bridge Product — Informational Report (15 Points) Using complete sentences , write at least 3 pros and at least 3 cons about your bridge. (6 points) If you could redesign it, what would it look like? (You may draw or write your answer) (9 points) What issues did you have when building the bridge? How did you overcome them?...
View
Full Document
- Fall '19