contoh laporan harian.xlsx - JADWAL WAKTU PELAKSANAAN(TIME SCHEDULE NAMA KEGIATAN NAMA PEKERJAAN NOMOR KONTRAK TANGGAL KONTRAK NOMOR SPMK TANGGAL SPMK

contoh laporan harian.xlsx - JADWAL WAKTU PELAKSANAAN(TIME...

This preview shows page 1 out of 208 pages.

Unformatted text preview: JADWAL WAKTU PELAKSANAAN (TIME SCHEDULE) NAMA KEGIATAN NAMA PEKERJAAN NOMOR KONTRAK TANGGAL KONTRAK NOMOR SPMK TANGGAL SPMK LOKASI KONTRAKTOR PELAK KONSULTAN PENGAW : : : : : : : : : PEMBANGUNAN RKB SD NO. 3 MENGWI PEMBANGUNAN RKB SD NO. 3 MENGWI 193/KNT.DPUPR.TB/2017 20 JUNI 2017 239/SPMK.CK/DPUPR.TB/2017 21 JUNI 2017 BANJAR GAMBANG, MENGWI, BADUNG PT. JAYA AGUNG HUTAMA YASA PT. GAHARU SEMPANA WAKTU PELAKSANAAN DARI 180 ( SERATUS DELAPAN PULUH ) HARI KALENDER URAIAN PEKERJAAN VOLUME BOBOT SPMK 21 - 27 1 I I.B 1 2 3 4 5 6 7 8 9 10 11 I.D PEKERJAAN RKB LANTAI I PEKERJAAN TANAH DAN PONDASI Pek. Galian tanah pondasi menerus Pek. Galian tanah pondasi Foot Plat Pek. Galian tanah Bore Pile Pek. Urugan kembali tanah Pondasi menerus Pek. Urugan kembali tanah Pondasi setempat Pek. Urugan limestone peninggian lantai Pek. Urugan pasir di bawah pondasi menerus Pek. Urugan pasir di bawah pondasi setempat Pek. Urugan pasir di bawah lantai Pek. Pasangan batu kosong Pek. Pasangan pondasi batu kali 1 : 5 PEKERJAAN BETON 1 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada pondasi file cap 2 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada lantai 3 Pek.File cap 1 x 1,5 ( F1 ) a. Beton K.250 b. Begesting Pasangan Batako c. Pembesian 4 Pek.File cap 1,2 x 1,2 ( F2 ) a. Beton K.250 b. Begesting Pasangan Batako c. Pembesian 5 Pek.Bore Pile dia. 30 cm a. Beton K.300 b. Begesting Pipa Paralon c. Pembesian 6 Pek. Sloof 20/40 (K 250) S1 a. Beton K.250 b. Pembesian c. Begesting Sloof 7 Pek. Sloof 20/30 (K 250) S2 a. Beton K.250 b. Pembesian c. Begesting Sloof 8 Pek. Kolom K1 30 x 30 (K 250) a. Beton K.250 b. Pembesian c. Begesting 9 Pek. Kolom K1 30 x 45 (K 250) a. Beton K.250 b. Pembesian c. Begesting 10 Pek. Kolom K3 15 x 40 (K 250) a. Beton K.250 b. Pembesian c. Begesting 11 Pek. Kolom K4 20 x 20 (K 250) a. Beton K.250 b. Pembesian c. Begesting 12 Pek. Kolom KP 15 x 15 (K 250) a. Beton K.250 b. Pembesian c. Begesting 13 Pek. Lisplank Beton 12/85 (K 250) a. Beton K.250 b. Pembesian c. Begesting 14 Pek. Tangga Beton (K 250) a. Beton K.250 b. Pembesian c. Begesting 15 Pek. Balok Tangga 15/20 (K 250) JUNI - JULI 28 - 04 05 - 11 2 3 12 - 18 4 19 - 25 5 JULI - AGUSTUS 26 - 01 02 - 08 6 7 09 - 15 8 AGUSTUS - SEPTEMBER 16 - 22 23 - 29 30 - 05 06 - 12 9 10 11 12 13 - 19 13 SEPTEMBER - OKTOBER 20 - 26 27 - 02 03 - 09 14 15 16 10 - 16 17 OKTOBER - NOVEMBER 17 - 23 24 - 30 18 19 31 - 06 20 NOVEMBER - DESEMBER 07 - 13 14 - 21 21 22 PHO 22 - 28 23 29 - 05 06 - 12 24 25 13 - 17 26 MASA PEMELIHARA AN 730 HARI PHO 100 51.80 78.19 480.00 17.27 26.06 137.20 3.15 5.90 33.33 13.74 45.42 m3 m3 m2 m3 m3 m3 m3 m3 m3 m3 m3 0.303 0.458 6.185 0.030 0.046 2.087 0.044 0.083 0.469 0.538 3.059 0.303 0.458 2.85 m3 16.58 m3 0.206 1.199 17.10 m3 57.00 m2 2,589.68 kg 1.337 0.411 2.442 1.221 1.73 m3 5.76 m2 242.31 kg 0.135 0.042 0.228 0.042 0.228 33.91 m3 480.00 m1 14,617.32 kg 2.753 3.463 13.784 8.16 m3 1,963.59 kg 102.00 m2 0.638 1.852 0.865 6.48 m3 1,721.04 kg 86.40 m2 0.507 1.623 0.733 2.97 m3 670.66 kg 39.60 m2 0.232 0.632 0.527 0.232 0.632 0.527 12.47 m3 3,214.79 kg 138.60 m2 0.976 3.032 1.845 0.400 0.420 0.79 m3 203.52 kg 14.52 m2 0.062 0.192 0.193 0.062 0.192 0.193 0.26 m3 89.56 kg 5.28 m2 0.021 0.084 0.070 0.021 0.084 0.070 1.93 m3 431.44 kg 51.48 m2 0.151 0.407 0.685 0.151 0.407 0.685 9.18 m3 814.97 kg 163.80 m2 0.718 0.769 2.180 1.49 m3 337.89 kg 47.22 m2 0.116 0.319 0.629 3.092 3.092 0.030 0.046 1.044 0.044 1.044 0.083 0.469 0.538 3.059 90 0.206 1.199 1.337 0.411 1.221 0.135 1.377 1.732 1.732 6.892 1.377 6.892 80 0.926 0.638 0.926 0.865 0.811 S M P K T A N G G A L 2 1 J U N I 2 0 1 7 0.507 0.811 0.733 0.976 2.632 1.425 70 60 0.718 0.769 2.180 0.116 0.319 0.629 SERAH TERIMA PERTAMA TANGGAL 17 DESEMBER 2017 NO 50 40 SERAH TERIMA PERTAMA TANGGAL 17 DESEMBER 2017 S M P K a. Beton K.250 b. Pembesian c. Begesting 16 Pek. Pelat Wastafel Toilet (K 250) a. Beton K.250 b. Pembesian wiremesh M5 c. Begesting 17 Pek. Besi Beton Wiremesh BRC Type M5 18 Pek. Beton Bingkai Kusen 12,5 x 12,5 cm (Balok Latai) II II.B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 PEKERJAAN RKB LANTAI II PEKERJAAN BETON Pek. Kolom K2 30 x 30 (K 250) a. Beton K.250 b. Begesting c. Pembesian Pek. Kolom K2 30 x 45 (K 250) a. Beton K.250 b. Begesting c. Pembesian Pek. Kolom K3 15 x 40 (K 250) a. Beton K.250 b. Pembesian c. Begesting Pek. Kolom K4 20 x 20 (K 250) a. Beton K.250 b. Pembesian c. Begesting Pek. Kolom KP 15 x 15 (K 250) a. Beton K.250 b. Begesting c. Pembesian Pek. Balok B1 30/60 (K 250) a. Beton K.250 b. Pembesian c. Begesting Pek. Balok B2 20/40 (K 250) a. Beton K.250 b. Pembesian c. Begesting Pek. Balok B3 20/35 (K 250) a. Beton K.250 b. Pembesian c. Begesting Pek. Balok BA 20/30 (K 250) a. Beton K.250 b. Pembesian c. Begesting Pek. Pelat Lantai II (K 250) Type A1 a. Beton K.250 b. Pembesian Wiremesh M8 c. Begesting Floor Deck Pek. Pelat Lantai II (K 250) Type A2 a. Beton K.250 b. Pembesian c. Begesting Pek. Pelat Wastafel Toilet (K 250) a. Beton K.250 b. Pembesian c. Begesting Pek. Balok R1 20/40 (K 250) a. Beton K.250 b. Pembesian c. Begesting Pek. Balok R2 20/30 (K 250) a. Beton K.250 b. Pembesian c. Begesting Pek. Beton Bingkai Kusen 12,5 x 12,5 cm (Balok Latai) 0.22 m3 28.06 kg 2.61 m2 0.08 2.11 2.24 759.13 102.10 m3 kg m2 Kg m' 0.017 0.026 0.038 0.006 0.002 0.051 0.725 0.796 T A N G G A L 0.017 0.026 0.038 2 1 0.006 0.002 0.051 0.725 0.796 J U N I 2 0 1 7 3.02 m3 40.20 m2 680.82 kg 0.236 0.535 0.642 0.321 0.236 0.535 0.321 12.66 m3 140.70 m2 2,375.66 kg 0.990 1.873 2.240 1.120 0.990 1.873 1.120 0.60 m3 154.95 kg 11.06 m2 0.047 0.146 0.147 0.27 m3 90.91 kg 5.36 m2 0.021 0.086 0.071 0.021 0.086 0.071 2.11 m3 56.28 m2 471.66 kg 0.165 0.749 0.445 0.165 0.749 0.445 17.64 m3 3,923.54 kg 147.00 m2 1.380 3.700 2.116 1.850 2.116 1.850 8.96 m3 2,982.92 kg 112.00 m2 0.701 2.813 1.612 1.406 1.612 1.406 1.40 m3 372.69 kg 18.00 m2 0.109 0.351 0.259 0.259 0.42 m3 89.46 kg 5.60 m2 0.033 0.084 0.081 0.081 36.20 m3 1,708.84 kg 312.98 m2 2.831 1.632 4.523 0.816 2.262 3.55 m3 481.15 kg 60.98 m2 0.278 0.460 0.950 0.08 m3 2.11 kg 2.24 m2 0.006 0.002 0.030 0.006 0.002 0.030 3.36 m3 941.05 kg 42.00 m2 0.263 0.899 0.605 0.263 0.899 0.605 0.638 1.865 1.566 0.796 0.638 1.865 1.566 0.796 0.073 50 40 0.047 0.073 0.147 30 1.380 0.701 0.109 0.351 20 0.033 0.084 2.831 0.816 2.262 0.278 0.460 0.950 10 8.16 1,952.69 108.80 102.10 m3 kg m2 m' 0 100.00 RENCANA KOMULATIF RENCANA REALISASI KOMULATIF REALISASI MINGGUAN MINGGUAN MINGGUAN MINGGUAN DEVIASI - Mengetahui : Pejabat Pembuat Komitmen/PPK Kepala Bidang Cipta Karya Dinas Pekerjaan Umum dan Penataan Ruang Kabupaten Badung Menyetujui : Pejabat Pelaksana Teknis Kegiatan/PPTK Pembangunan RKB SD No. 3 Mengwi I GST. A. NGURAH ARINDA TRISNAWATI, ST Pembina Nip. 19690524 199803 2 005 KADEK DWI LANTARI, ST Penata Tk. I Nip. 19761116 200604 2 018 - 0.761 0.761 3.092 3.853 4.824 8.677 8.624 17.301 8.475 25.776 8.672 34.448 7.479 41.927 5.806 47.733 10.564 58.297 10.402 68.699 9.694 78.393 13.356 91.749 8.251 ### Disetujui : Direksi Teknis Dinas Pekerjaan Umum dan Penataan Ruang Kabupaten Badung I MADE GERIA Nip. 19650114 200604 1 004 I MADE SUJENDRA Nip. 19601225 200604 1 013 I MD. GD. BAYU JANASUPUTRA KADEK HENDRA ROBIAWAN, ST Diperiksa : Konsultan Pengawas PT. GAHARU SEMPANA Badung, 21 Juni 2017 Dibuat : Kontraktor Pelaksana PT. JAYA AGUNG HUTAMA YASA WAYAN GDE YASA, ST Direktur I GUSTI KETUT AGUNG YASA, S.Pd Direktur Utama U PELAKSANAAN (TIME SCHEDULE) % 100 90 80 70 60 50 40 50 40 30 20 10 0 I GUSTI KETUT AGUNG YASA, S.Pd RENCANA ANGGARAN BIAYA (RAB) PEKERJAAN : Pembangunan RKB SD No. 3 Mengwi TAHUN : 2017 VOLUME SAT NO ANALISA 3 4 5 PEKERJAAN RKB LANTAI I PEKERJAAN PERSIAPAN Pek. Pengukuran dan bouwplank Pek. Papan nama proyek 90.00 1.00 m' ls I.2 dihit. I.B PEKERJAAN TANAH DAN PONDASI 1 Pek. Galian tanah pondasi menerus 51.80 m3 78.19 m3 480.00 m2 dihit. NO. URAIAN PEKERJAAN 1 I I.A 1 2 2 HARGA SATUAN ( Rp ) 6 JUMLAH HARGA ( Rp ) 7 32,850.50 350,000.00 Jumlah A 2,956,545.00 350,000.00 3,306,545.00 II.1 56,787.50 2,941,819.65 II.1 56,787.50 4,440,328.20 125,000.00 60,000,000.00 294,181.97 2 Pek. Galian tanah pondasi Foot Plat 3 Pek. Galian tanah Bore Pile 4 Pek. Urugan kembali tanah Pondasi menerus 17.27 m3 II.9 17,036.25 5 Pek. Urugan kembali tanah Pondasi setempat 26.06 m3 II.9 17,036.25 444,032.82 6 Pek. Urugan limestone peninggian lantai 137.20 m3 II.15 147,587.50 20,249,491.89 7 Pek. Urugan pasir di bawah pondasi menerus 3.15 m3 II.11 136,475.00 429,896.25 8 Pek. Urugan pasir di bawah pondasi setempat 5.90 m3 II.11 136,475.00 805,748.40 9 Pek. Urugan pasir di bawah lantai 33.33 m3 II.11 136,475.00 4,548,745.87 10 Pek. Pasangan batu kosong 13.74 m3 III.8 379,717.65 5,216,750.93 11 Pek. Pasangan pondasi batu kali 1 : 5 45.42 m3 III.3 653,426.25 Jumlah B 29,677,309.34 129,048,305.32 I.C PEKERJAAN PASANGAN DAN PLESTERAN 1 Pek. Pasang bata ringan 341.11 m2 IV.16a 161,086.00 54,947,741.01 2 Pek. Plesteran dinding Pmortar 593.44 m2 V.19 93,264.25 55,346,383.98 3 Pek. Acian dinding+ beton ex.Pmortar 865.95 m2 V.20 32,849.50 Jumlah C 28,446,187.79 138,740,312.78 I.D PEKERJAAN BETON 1 2 3 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada pondasi file cap Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada lantai Pek.File cap 1 x 1,5 ( F1 ) a. Beton K.250 2.85 m3 VII.4 701,484.54 1,999,230.94 16.58 m3 VII.4 701,484.54 11,630,942.50 17.10 m3 VII.7 758,700.41 12,973,777.07 b. Begesting Pasangan Batako c. Pembesian Pek.File cap 1,2 x 1,2 ( F2 ) a. Beton K.250 57.00 2,589.68 m2 kg IV.13 69,965.50 9,148.42 3,988,033.50 23,691,495.70 1.73 m3 VII.7 758,700.41 1,311,034.31 b. Begesting Pasangan Batako c. Pembesian Pek.Bore Pile dia. 30 cm a. Beton K.300 5.76 242.31 m2 kg IV.13 69,965.50 9,148.42 403,001.28 2,216,748.14 33.91 m3 VII.7 787,682.56 26,711,890.85 b. Begesting Pipa Paralon c. Pembesian 6 Pek. Sloof 20/40 (K 250) S1 a. Beton K.250 b. Pembesian c. Begesting Sloof 7 Pek. Sloof 20/30 (K 250) S2 a. Beton K.250 b. Pembesian c. Begesting Sloof 8 Pek. Kolom K1 30 x 30 (K 250) a. Beton K.250 b. Pembesian c. Begesting 9 Pek. Kolom K1 30 x 45 (K 250) a. Beton K.250 b. Pembesian c. Begesting 10 Pek. Kolom K3 15 x 40 (K 250) a. Beton K.250 b. Pembesian c. Begesting 480.00 14,617.32 m1 kg dihit. 70,000.00 9,148.42 33,600,000.00 133,725,331.26 m3 kg m2 VII.13a 2x pakai 8.16 1,963.59 102.00 758,700.41 9,148.42 82,278.00 6,190,995.37 17,963,723.75 8,392,356.00 m3 kg m2 VII.12 2x pakai 6.48 1,721.04 86.40 758,700.41 9,148.42 82,278.00 4,916,378.68 15,744,810.82 7,108,819.20 m3 kg m2 VII.12 2x pakai 2.97 670.66 39.60 758,700.41 9,148.42 129,124.00 2,253,340.23 6,135,497.20 5,113,310.40 2x pakai 12.47 3,214.79 138.60 m3 kg m2 758,700.41 9,148.42 129,124.00 9,464,028.96 29,410,202.57 17,896,586.40 2x pakai 0.79 203.52 14.52 m3 kg m2 758,700.41 9,148.42 129,124.00 600,890.73 1,861,857.37 1,874,880.48 4 5 VII.12a VII.13a VII.13a VII.7 VII.15 VII.7 VII.15 VII.7 VII.16a VII.7 VII.12 VII.16a VII.7 VII.12 VII.16a 11 Pek. Kolom K4 20 x 20 (K 250) a. Beton K.250 b. Pembesian c. Begesting 12 Pek. Kolom KP 15 x 15 (K 250) a. Beton K.250 b. Pembesian c. Begesting 13 Pek. Lisplank Beton 12/85 (K 250) a. Beton K.250 b. Pembesian c. Begesting 14 Pek. Tangga Beton (K 250) a. Beton K.250 b. Pembesian c. Begesting 15 Pek. Balok Tangga 15/20 (K 250) a. Beton K.250 b. Pembesian c. Begesting 16 Pek. Pelat Wastafel Toilet (K 250) a. Beton K.250 b. Pembesian wiremesh M5 c. Begesting 17 Pek. Besi Beton Wiremesh BRC Type M5 18 Pek. Beton Bingkai Kusen 12,5 x 12,5 cm (Balok Latai) I.E 1 2 3 4 5 6 7 8 9 2x pakai 0.26 89.56 5.28 m3 kg m2 2x pakai 1.93 431.44 51.48 m3 kg m2 2x pakai 9.18 814.97 163.80 m3 kg m2 2x pakai 1.49 337.89 47.22 m3 kg m2 2x pakai 0.22 28.06 2.61 m3 kg m2 0.08 2.11 2.24 759.13 102.10 m3 kg m2 Kg m' VII.18b 304.90 5.20 1.28 88.78 20.88 74.98 13.20 19.40 18.19 m2 XIII.1a m2 XIII.2 2x pakai PEKERJAAN PASANG KERAMIK LANTAI & DINDING Pek. Pasang lantai keramik 40 x 40 cm Pek. Pasang lantai keramik Km/Wc 20 x 20 cm Pek. Pasang keramik Pelat Wastafel 20 x 20 cm Pek. Pasang dinding keramik 40 x 40 cm Pek. Pasang dinding keramik Km/Wc 20 x 25 cm Pek. Pasang border keramik 10 x 40 cm Pek. Pasang border keramik Km/Wc 10 x 20 cm Pek. Pasang Plint keramik tangga 10 x 30 cm Pek. Pasang keramik 30 x 30 cm pada tangga I.F PEK. PASANG KUSEN, PINTU DAN JENDELA 1 Pek. Pasang kusen 5/14 kayu Kamper VII.7 VII.12 VII.16a VII.7 VII.12 VII.16a VII.7 VII.12 VII.16a VII.7 VII.12 VII.16a VII.7 VII.12 VII.17a VII.7 VII.13 VII.13 VII.30 m2 XIII.2 m2 XIII.1a m2 XIII.2a m' XIII.3 m' XIII.3b m' XIII.3a m2 XIII.1 758,700.41 9,148.42 129,124.00 200,296.91 819,306.54 681,774.72 758,700.41 9,148.42 129,124.00 1,464,671.15 3,946,959.02 6,647,303.52 758,700.41 9,148.42 129,124.00 6,964,869.80 7,455,722.20 21,150,511.20 758,700.41 9,148.42 129,124.00 1,128,756.54 3,091,189.23 6,097,396.69 758,700.41 9,148.42 139,650.00 167,862.47 256,738.45 364,591.24 758,700.41 9,266.01 221,911.50 9,266.01 75,673.40 Jumlah D 60,089.07 19,539.23 497,969.41 7,034,123.56 7,726,254.14 462,955,088.77 151,563.25 165,350.75 165,350.75 151,563.25 132,077.75 32,328.15 32,258.15 32,328.15 161,013.25 Jumlah E 46,211,062.02 859,823.90 210,822.21 13,455,785.34 2,757,783.42 2,423,964.69 425,807.58 627,166.11 2,929,434.82 69,901,650.07 1.46 m3 VI.1 8,609,112.50 12,569,304.25 2 3 4 Pek. Pasang daun pintu panil kayu Kamper Pek. Pasang daun pintu teakwood + aluminium (WC) Pek. Pasang daun pintu marine plywood 6 mm + formika (Shaft) 12.48 4.60 1.56 m2 m2 m2 VI.5d VI.12 VI.12 551,125.00 475,610.00 472,049.00 6,878,040.00 2,187,806.00 736,396.44 5 Pek. Pasang daun jendela kaca 5 mm 24.40 m2 VI.6 439,830.00 10,733,259.46 Pek. Pasang ventilasi kaca Pek. Pasang kunci pintu KM/WC Pek. Pasang kunci pintu 2 slaag Pek. Pasang Espagnoilet tanam Pek. Pasang engsel pintu Pek. Pasang engsel jendela Pek. Pasang grendel Pek. Pasang kait angin Pas. Hand Railing Tangga BSP Ø 2 Pek. Almari Tanam Multiplek + Teaxwood Dipolitor Pek. Pintu Harmonika Pas. Kaca Cermin atas wastafel 21.84 2.00 4.00 8.00 40.00 98.00 49.00 98.00 13.90 4.00 33.60 2.00 m2 bh bh bh bh bh bh bh m' unit m2 bh XII.6 XII.5 XII.1 XII.5a XII.2 XII.3 XII.5b XII.4 Dihit Dihit Dihit Dihit 57,808.75 76,976.50 228,015.50 92,247.00 39,117.00 37,997.00 60,747.00 21,442.00 400,000.00 6,000,000.00 600,000.00 225,000.00 Jumlah F 1,262,543.10 153,953.00 912,062.00 737,976.00 1,564,680.00 3,723,706.00 2,976,603.00 2,101,316.00 5,560,000.00 24,000,000.00 20,160,000.00 450,000.00 96,707,645.25 26,312,009.07 6 7 8 9 10 11 12 13 14 15 16 17 I.G PEKERJAAN PLAFOND 1 Pek. Pasang plafond Gypsum 9 mm + Rangka Hollow 400 x 400 mm 2 Pek. Pasang plafond Kalsiboard 4,5 mm + Rangka Hollow 400 x 40 3 4 5 Pek. Pasang plafond Kayu Semen Lap Sidding 8' + Rangka Hollow Pek. List plafon Gypsum Pek. List plafon Lap Sidding 2" I.H 1 2 3 4 5 6 7 PEKERJAAN PENGECATAN Pek. Pengecatan dinding + beton Pek. Pengecatan Plafond Pek. Polituran plafond dan list Kayu Semen Pek. Polituran Kayu kusen Pek. Polituran daun pintu + daun jendela Pek. Waterproofing Km/Wc Pek. Pengecatan Pintu Harmonica 232.54 m2 IX.6a 113,151.00 5.20 m2 IX.6b 111,367.40 579,110.48 72.00 76.00 73.20 m2 m' m' IX.6c IX.8 IX.8a 206,116.50 25,387.50 26,762.50 Jumlah G 14,840,388.00 1,929,450.00 1,959,015.00 45,619,972.55 865.95 237.74 149.20 0.17 118.24 23.76 67.20 m2 XIV.3 m2 XIV.1 m2 XIV.7 m2 XIV.7 m2 XIV.7 m2 XIV.8 m2 XIV.5 18,180.79 25,536.90 34,955.35 34,955.35 34,955.35 47,532.59 21,667.50 Jumlah H 15,743,741.13 6,071,114.52 5,215,338.22 5,789.81 4,133,092.62 1,129,374.22 1,456,056.00 33,754,506.52 I.I PEKERJAAN STYLE BALI 1 Tempelan Batu Candi di ukir pada Pintu Utama 17.12 m2 XV.7a 616,453.33 2 Tempelan Batu Candi pada Pintu Utama 21.28 m2 XV.2d 256,425.00 5,455,441.88 3 Tempelan Batu Candi pada Kolom List Batu Candi Hitam Dinding 128.16 m2 XV.2d 256,425.00 32,863,428.00 15.00 10.50 36.00 45.00 m2 m' m2 m2 XV.2d XV.3 XV.2d V.2 256,425.00 273,870.00 256,425.00 50,055.65 Jumlah I 3,846,375.00 2,875,635.00 9,231,300.00 2,252,504.25 67,075,282.93 13.30 m1 X.8 30,277.50 402,690.75 30.20 2.00 m1 X.10a pcs Dihit 241,134.63 24,113.46 7,282,265.68 48,226.93 32.70 m1 X.10 174,512.13 5,706,546.49 2.00 2.00 2.00 2.00 bh X.2a bh X.11 bh X.12 bh X.4 619,740.00 41,232.50 286,184.00 890,466.00 1,239,480.00 82,465.00 572,368.00 1,780,932.00 1.00 unit X.13 7,542,730.32 Jumlah J 7,542,730.32 24,657,705.15 1.00 1.00 39.00 8.00 4.00 6.00 8.00 24.00 15.00 2.00 8.00 4.00 unit unit titik titik bh bh bh bh bh bh bh bh Dihit Dihit XVII.1 XVII.1 XVII.1a XVII.1b XVII.1c XVII.1d XVII.1e Dihit Dihit Dihit 7,500,000.00 2,500,000.00 217,695.00 217,695.00 28,295.50 54,195.50 54,195.50 260,048.30 114,408.75 292,480.00 979,872.50 3,500,000.00 Jumlah K 7,500,000.00 2,500,000.00 8,490,105.00 1,741,560.00 113,182.00 325,173.00 433,564.00 6,241,159.20 1,716,131.25 584,960.00 7,838,980.00 14,000,000.00 51,484,814.45 1,123,251,828.78 4 5 6 7 I.J a 1 b 1 2 c 1 d 1 2 3 4 e 1 I.K 1 2 3 4 5 6 7 8 9 10 11 12 List Bata Gosok Pas. Batu Candi Pada Dinding Selasar Pek. Plesteran SOS PEKERJAAN SANITAIR/ PLUMBING Instalasi pemipaan untuk air bersih Pipa PVC AW Ø 1/2" Instalasi pemipaan untuk air kotor (dari kloset) Pipa PVC AW Ø 4" CO Ø 4" Instalasi pemipaan untuk air buangan Pipa PVC AW Ø 3" Pekerjaan alat-alat sanitary Closet Jongkok setara TOTO Kran air Floor Drain TOTO Wastafel ex. TOTO Pekerjaan Lain-lain Pekerjaan Septictank + peresapan PEKERJAAN ELEKTRIKAL Kilometer PLN Box Panel MCB Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam kond Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit Saklar tunggal [1 way 1 gang] Saklar ganda[1 way 2 gang] Stop kontak Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka Pek. Pas. Lampu down light PL 14 Watt philips Pek. Exhaust Fan Pek. Refrigeran Drain AC dan Power Listrik Pek. Pasang LCD Proyektor Setara MX528, Layar Setara DMS 220 SUB TOTAL RUANG KEPSEK DAN RUANG GURU LANTAI 1 II PEKERJAAN RKB LANTAI II II.A PEKERJAAN PASANGAN DAN PLESTERAN 1 Pek. Pasang bata ringan 10,550,598.80 359.00 m2 IV.16a 161,086.00 57,830,518.34 2 Pek. Plesteran dinding PMortar 695.93 m2 V.5 93,264.25 64,905,202.97 3 Pek. Acian dinding+ beton ex.PMortar 968.45 m2 V.18 32,849.50 Jumlah A 31,812,991.51 154,548,712.83 II.B PEKERJAAN BETON 1 Pek. Kolom K2 30 x 30 (K 250) a. Beton K.250 2 3 4 5 6 7 3.02 m3 VII.7 758,700.41 2,287,481.75 b. Begesting c. Pembesian Pek. Kolom K2 30 x 45 (K 250) a. Beton K.250 2x pakai 40.20 680.82 m2 kg IV.15 VII.12 129,124.00 9,148.42 5,190,784.80 6,228,459.27 12.66 m3 VII.7 758,700.41 9,607,423.34 b. Begesting c. Pembesian Pek. Kolom K3 15 x 40 (K 250) a. Beton K.250 b. Pembesian c. Begesting Pek. Kolom K4 20 x 20 (K 250) a. Beton K.250 b. Pembesian c. Begesting Pek. Kolom KP 15 x 15 (K 250) a. Beton K.250 2x pakai 140.70 2,375.66 m2 kg IV.15 VII.12 129,124.00 9,148.42 18,167,746.80 21,733,507.99 m3 kg m2 VII.7 VII.12 2x pakai 0.60 154.95 11.06 758,700.41 9,148.42 129,124.00 457,496.35 1,417,550.49 1,427,465.82 2x pakai 0.27 90.91 5.36 m3 kg m2 VII.16a 758,700.41 9,148.42 129,124.00 203,331.71 831,720.27 692,104.64 b. Begesting c. Pembesian Pek. Balok B1 30/60 (K 250) a. Beton K.250 b. Pembesian c. Begesting Pek. Balok B2 20/40 (K 250) a. Beton K.250 b. Pembesian c. Begesting 2x pakai VII.16a VII.7 VII.12 2.11 m3 VII.7 758,700.41 1,601,237.22 56.28 471.66 m2 kg IV.15 VII.12 129,124.00 9,148.42 7,267,098.72 4,314,973.85 2x pakai 17.64 3,923.54 147.00 m3 kg m2 VII.7 VII.12 VII.17a 758,700.41 9,148.42 139,650.00 13,383,475.29 35,894,186.36 20,528,550.00 2x pakai 8.96 2,982.92 112.00 m3 kg m2 VII.7 VII.12 VII.16 758,700.41 9,148.42 139,650.00 6,797,955.70 27,289,021.03 15,640,800.00 8 9 10 11 12 13 14 15 II.C 1 2 3 3 4 5 6 7 8 Pek. Balok B3 20/35 (K 250) a. Beton K.250 b. Pembesian c. Begesting Pek. Balok BA 20/30 (K 250) a. Beton K.250 b. Pembesian c. Begesting Pek. Pelat Lantai II (K 250) Type A1 a. Beton K.250 b. Pembesian Wiremesh M8 c. Begesting Floor Deck Pek. Pelat Lantai II (K 250) Type A2 a. Beton K.250 b. Pembesian c. Begesting Pek. Pelat Wastafel Toi...
View Full Document

  • Spring '19
  • GUSDHAR

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Ask Expert Tutors You can ask You can ask ( soon) You can ask (will expire )
Answers in as fast as 15 minutes