LAPORAN PRAKTIKUM ANALISIS DAN PERANCANGAN KERJA (1).docx - LAPORAN PRAKTIKUM ANALISIS DAN PERANCANGAN KERJA MODUL 1 DISUSUN OLEH TIMOTIUS SETYONO

LAPORAN PRAKTIKUM ANALISIS DAN PERANCANGAN KERJA (1).docx -...

This preview shows page 1 - 6 out of 10 pages.

LAPORAN PRAKTIKUM ANALISIS DAN PERANCANGAN KERJA MODUL 1 DISUSUN OLEH: TIMOTIUS SETYONO / C13170018 CHEDIE PUTRA H. / C13170054 MICHAEL GILBERT / C13170065 JEZREEL WILLY A. / C13170086 ALEX RANDY SAMUEL S. / C13170124
Image of page 1

Subscribe to view the full document.

A. ELEMEN PROSES 1. Memasang plastik ke body bawah 2. Memasang baut panjang ke plastic 3. Memasang baut pendek ke lempengan kiri 4. Memasang lempengan kiri ke body bawah 5. Memasang baut pendek ke lempengan kanan 6. Memasang lempengan kanan ke body bawah 7. Memasang baut pendek ke lempengan tengah 8. Memasang lempengan tengah ke body bawah 9. Memasang baut sedang ke tanduk 10.Memasang tanduk ke body bawah 11.Memasang body atas ke body bawah 12.Memasang baut ke body atas B. WAKTU SETIAP ELEMEN
Image of page 2
Percobaan 1 Percobaan 2 Percobaan 3 Percobaan 4 Percobaan 5 Rata-Rata 1 1.21 2.09 2.46 2.12 2.16 2.008 2 33.24 34.57 28.81 35.4 25.12 31.428 3 33.82 21.29 24.69 13.23 20.58 22.722 4 5 2.95 4.66 5.2 3.13 4.188 5 15.28 13.26 15.04 18.51 15.42 15.502 6 3.27 6.09 5.3 9.12 3.84 5.524 7 16.77 14.89 18.26 17.39 14.11 16.284 8 4.48 4.97 4.51 3.87 3.24 4.214 9 5.31 4.17 4.77 4.18 2.8 4.246 10 8.01 9.62 14.66 10.8 12.09 11.036 11 5.7 2.87 5.21 5.62 4.29 4.738 12 13.32 12.88 15.74 14.85 9.01 13.16 13 4.48 5.12 4.59 5.23 3.75 4.634 14 13.45 9.71 9.2 13 9.26 10.924 15 2.3 4.01 3.02 3.2 4.16 3.338 16 11.73 14.7 16.38 11.34 11.45 13.12 17 5.6 8.52 7.7 6 2.98 6.16 18 45.16 42.03 43.09 34.79 31.45 39.304 Total Waktu 228.13 213.74 228.09 213.85 178.84 C. GAMBAR OBJEK DAN LAYOUT OBJEK PENGAMATAN
Image of page 3

Subscribe to view the full document.

Image of page 4
D. PETA TANGAN KIRI TANGAN KANAN 1. Memasang baut panjang ke plastik (Elemen 2) Operation : Memasang baut panjang ke plastik Part :- Summary Left hand Right hand Operator Name & No : Alex Randy Samuel Sitorus Effective time : 1.984 31.734 Analyst : Timotius Setyono Date :5-09- 2018 Ineffective time: 31.716 - Method : Present Proposed Cycle time : 33.7 Sketch : Left hand Description Symbol Time (Detik) Time Symbol Right Hand Description Mengambil plastik RE G M 1.984 1.564 RE G M Mengambil baut panjang Menahan plastik H 31.716 3.608 A Memasang baut panjang 0.822 RE G M Mengambil obeng 9.736 U
Image of page 5

Subscribe to view the full document.

Image of page 6
  • Fall '14
  • Bali

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Ask Expert Tutors You can ask You can ask ( soon) You can ask (will expire )
Answers in as fast as 15 minutes