F G H Variance Analysis 12 Special order lamps are manufactured in di.docx - F G H Variance Analysis 12 Special order lamps are manufactured in

F G H Variance Analysis 12 Special order lamps are manufactured in di.docx

This preview shows page 1 - 3 out of 3 pages.

Image of page 1
F G H Variance Analysis 12 Special order lamps are manufactured in division S. Because of the precise nature of the process a 19 standard cost system has been developed. The following standards are used for the special orders: 20 21 . Standards Lamp Kits Direct Labor Variable Overhead * Fixed Overhead Total $ 16.000000 per lamp 2.400000 per lamp (4 lamps/hr.) 0.250000 per lamp (4 lamps/hr.) 10.000000 per lamp $ 28.650000 33 34 41 42 ** Fixed overhead is based on expected production of 4,014 customized lamps each month. 43 44 To keep records of the actual cost of a job, a Job Order Cost System has been developed. Entries 45 are made to the Job Order System at actual cost (overhead is applied based on actual labor hours) 52 while entries are made to the accounting system at standard. Variance analysis is used to analyze the 53 differences. 54 56 63 Job Order Costing Section 64 65 On January 1, 20x2. Division S began Job 1101 for the Client, THE BIG CHILDREN STORE. The 66 job called for 4,000
Image of page 2
Image of page 3

You've reached the end of your free preview.

Want to read all 3 pages?

Unformatted text preview: customized lamps. The following set of transactions occurred from 67 January 5 until the job was completed: 74 75 76 77 78 5-Jan Purchased 4,200 Lamp Kits @ $16.25 per kit. 9-Jan 4,050 sets of Lamp Kits were requisitioned. 17-Jan Payroll of 630 Direct Labor Hours @ $9.55 per hour. 30-Jan Payroll of 680 Direct Labor Hours @ $9.80 per hour. 30 Jan 3,986 lamps were completed and shipped. All materials requisitioned were used or scrapped. 88 89 96 98 100 Month End Overhead Information Actual Variable Overhead Actual Fixed Overhead $ 1,336.20 $ 41,123.45 108 709 How many Lamps were completed? Note: Show favorable variances as negative numbers Round dollars to two places, $##.## What was the total material price variance for the Lamp Kits purchased? {15.01) What was the material usage variance for Lamp Kits? {15.02) What was the direct labor efficiency variance ? {15.03) What was the direct labor rate variance? {15.04...
View Full Document

  • Winter '19
  • Richard Levi

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask ( soon) You can ask (will expire )
Answers in as fast as 15 minutes
A+ icon
Ask Expert Tutors