21- Which of the following statements is MOST incorrect�� ��� .docx - 21 Which of the following statements is MOST incorrect �� ���

21- Which of the following statements is MOST incorrect�� ��� .docx

This preview shows page 1 - 4 out of 4 pages.

Image of page 1
21- Which of the following statements is MOST incorrect? �� ��� * A risk has a cause and, if it occurs a consequence ��� ��� * There are negative risks and positive risks ��� ��� * Positive risks may be viewed as opportunities and should be pursued ��� ��� * Negative risks must be eliminated before project plan execution 22- As part of risk identification, you are tasked with using a technique called SWOT. Which of the following describes SWOT? �� ��� * Analysis of: strengths, weakness, options, and timing ��� ��� * An elite project team that comes in and fixes project risks and threats ��� ��� * Analysis of strengths, weakness, opportunities, and threats ��� ��� * Technique for rating risks on a scale from 1 to 100 23- Which of the following statements is MOST true? �� ��� * Risks that are assessed with scores in the lower left portion of a typical P-I matrix indicate low probability with
Image of page 2
low impact ��� ��� * Risks that are assessed with scores in the lower left
Image of page 3
Image of page 4

You've reached the end of your free preview.

Want to read all 4 pages?

Unformatted text preview: portion of a typical P-I matrix indicate high probability with high impact ��� ��� * Risks that are assessed with scores in the upper right portion of a typical P-I matrix indicate low probability with low impact ��� ��� * Risks that are assessed with scores in the upper right portion of a typical P-I matrix indicate high probability with low impact 24- Which of the following is the cost estimate technique that involves developing detailed estimates at the work package level of the WBS, thereafter rolling them up to derive the project's total cost? �� ��� * Analogous estimating ��� ��� * Parametric estimating ��� ��� * Bottom - up estimating ��� ��� * Probabilistic estimating 25- A budgetary estimate should be accurate to what degree? �� ��� * A rough order of magnitude ��� ��� * -10% to +25%"" ��� ��� * -5% to +10%"" ��� ��� * A top down figure...
View Full Document

  • Fall '17
  • Bob Maxwell

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask ( soon) You can ask (will expire )
Answers in as fast as 15 minutes
A+ icon
Ask Expert Tutors