Acq 202 module 2.docx - Acq 202 module 2.1-2.6 1 System-specific Validated Online Lifecycle Threat(VOLT reports are required to be kept current and

Acq 202 module 2.docx - Acq 202 module 2.1-2.6 1...

This preview shows page 1 - 3 out of 5 pages.

Acq 202 module 2.1-2.61.System-specific Validated Online Lifecycle Threat (VOLT) reports are required to be kept current and validated throughout the acquisition process. All Major Defense Acquisition Programs (MDAPs) must have a updated VOLT in place at: a.IOC (O&S Phase)b.Milestone B (EMD Phase)c.FRP (P&D Phase)d.Milestone A (TMRR Phase)2.Sources of risk include: 3.Joint Interoperability test Command (JITC) has primary responsibility for developmental test and evaluation (T&E) functions throughout the DoD. a.Trueb.False4.Design of Experiments (DOE) can have a positive impact on test and evaluation (T&E) resources by providing an efficient/effective means to ascertain the appropriate test sample sizes and therefore enable reductions in cost and schedule a.Trueb.False5.One of the primary disadvantage of international cooperative development includes6.Who would certify the interoperability performance of a command and control system used by both the Army and the Navy?7.Transitioning to Integrated Product and process Development (IPPD) will involve application of certain key tenants, such as customer focus, concurrent development, and: a.Event-driven schedulingb.Risk avoidance c.Supervisory Leadershipd.Reliance on independent organizations8.As part of the Program Protection Plan (PPP), cybersecurity is a critical priority for DoD. Effective cybersecurity in DoD acquisition programs encompasses all of the necessary actions taken to ensure the _____ of a system’s information to enable warfighting operations.
Background image
Background image
Image of page 3

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture