LG_HM01_1458_1000.docx - Running head SYSTEM ANALYSIS AND DESIGN SYSTEM ANALYSIS AND DESIGN Student\u2019s name University affiliation Running head SYSTEM

LG_HM01_1458_1000.docx - Running head SYSTEM ANALYSIS AND...

This preview shows page 1 - 3 out of 6 pages.

Running head: SYSTEM ANALYSIS AND DESIGN SYSTEM ANALYSIS AND DESIGN Student’s name University affiliation
Image of page 1
Running head: SYSTEM ANALYSIS AND DESIGN System Analysis and Design Systems analysis and design mainly is responsible in development of software. They are created to solve problems which may be dynamic in the world and requires solutions. Collection of components that correlate to realize some objectives forms a system. It should be noted that there are three major components that every system must contain namely input, processing and output. A system should contain different components that are connected to each other and they should be independent. (Matt, 2012) It should be noted that some output is produced as a result of processing the suitable inputs and may include an additional element known as control that will be essential in provision of feedback that achieve the desired objectives. The life cycle of system is an organizational process that involves organizational process development and maintain systems. It is essential in project planning as it gives the overall list of approaches that may be required in development of the entire system. It results in combination of various activities that includes preliminary study which is a brief investigation about the system under investigation And gives a blue-print of what actually the physical system comprises off. It also involves the preparation of a proposal which highlights the problem definition, objectives of knowledge represented, terms of reference involved and the expected benefits of the system. The feasibility study is mainly concern with the testing the proposed system in relation to its workability and also meeting the user requirement. In addition it ensures that there is effective use of the resources and cost is maintained at a lower level. It can be categorized into technical, operational economic and schedule feasibility. The main goal involved in feasibility study is to achieve the scope and also solve the problems that might arise. (Guidry & Totaro, 2011)
Image of page 2
Image of page 3

You've reached the end of your free preview.

Want to read all 6 pages?

  • Winter '19
  • Rizu

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask You can ask (will expire )
Answers in as fast as 15 minutes
A+ icon
Ask Expert Tutors