FE 201 Intermediate Facilities Engineering.docx - FE 201 Intermediate Facilities Engineering(25 Questions 1 Funds in the following types of

FE 201 Intermediate Facilities Engineering.docx - FE 201...

This preview shows page 1 - 3 out of 6 pages.

FE 201 Intermediate Facilities Engineering(25 Questions)1.Funds in the following types of appropriation accounts must generally be committed before theyare obligate, except for:a.Procurementb.Operations and Maintenancec.RDT&Ed.Military Construction2.Which OSD department oversees the programming, budgeting, and execution processes across the full spectrum of installations management functions?3.What are the three environments that interact to form an installation?4.Which of the following statements about the FYDP is not true?5.Given the precedence diagram above, what is the Critical Path:a.A-E-F-G-Hb.A-B-C-Hc.A-D-H6.For project planning purposes facilities projects fall into four categories. Which of the following shows the correct four categories (in no particular order)?7.The In-House Design Team can contain all but one of the following disciplines:8.On a contract to overlay one of our runways with 2’ inches of asphalt concrete, we would like to review and approve the mix design for the asphalt. What clause gives us this authority?
Background image
9.Which of the following is not one of the eight critical issues, as defined by DOD that present challenges to sustainable range management?a.Growth in size of military rangesb.Frequency encroachmentc.Growth of urban areasd.Endangered species protection and critical habitat designations
Background image
Image of page 3

You've reached the end of your free preview.

Want to read all 6 pages?

  • Spring '18
  • DAU.edu FE 201

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture