MIS 432 - Exam 1 Cheat Sheet

MIS 432 - Exam 1 Cheat Sheet - C H A P T E R 1. A. B. C. D....

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
C H A P T E R   1 1. In   which   phase   of   the   SDLC   is   the   project   plan  developed? A.  analysis B.  design C.  implementation D.  planning E.  reconstruction 2. In   which  phase  of   the  SDLC  is  the   system   proposal  developed? A.  analysis B.  design C.  implementation D.  planning E.  system delivery 3. The   analysis   phase   of   the   SDLC   answers   which  questions _. A.  who wil  create the system and when wil  it be used B.  who will the system be for, what the system will do,  when will it be used, and where will it be used C.  why build the system, what the system wil  be, and how  the system wil  work D.  why build the system, who wil  the system be for, when  wil  it be used, and how the system wil  work E.  why build the system, who wil  the system be for, when  wil  it be used, and where wil  it be used 4. Deciding   how   the   hardware,   software,   and   network  infrastructure wil  operate occurs during the _ phase of the  SDLC. A.  analysis B.  design C.  implementation D.  planning E.  strategy 5. In which phase of the SDLC is the system specification  developed? A.  analysis B.  design C.  implementation D.  planning E.  system delivery 6. Interfaces   (e.g.,   menus,   reports,   forms)   are   specified  during the _ phase of the SDLC. A.  analysis B.  design C.  implementation D.  planning E.  system delivery 7. The phase of the SDLC when the system is actual y built  or purchased is the _. A.  analysis B.  construction C.  design D.  implementation E.  planning 8. A   development   methodology   that   focuses   on   the  processes of the system first is said to be _. A.  a structured design B.  data-centered C.  process-centered D.  object-oriented E.  structure-oriented 9. The   principal   disadvantages(s)   with   the   waterfal   development methodology is (are) _. A.  a long time elapses between completion of the system  proposal and the delivery of the system B.  it   identifies   system   requirements   long   before  programming begins C.  it minimizes changes to the requirements as the project  proceeds D.  the design must be completely specified on paper before  programming begins E.  a   long   time   elapses   between   completion   of   the  system proposal and the delivery of the system and the  design   must   be   completely   specified   on   paper   before  programming begins 10. _ development is a structured design methodology that  proceeds in a sequence from one phase to the next. A. 
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/02/2008 for the course MIS 432 taught by Professor Staff during the Spring '08 term at Iowa State.

Page1 / 2

MIS 432 - Exam 1 Cheat Sheet - C H A P T E R 1. A. B. C. D....

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online