CE168P-UNIT-PRICE-ANALYSIS.xlsx - UNIT PRICE ANALYSIS PROJECT CONSTRUCTION OF A 10-STOREY SCHOOL BUILDING SAINT DOMINIC COLLEGE OF ASIA LOCATION Emilio

CE168P-UNIT-PRICE-ANALYSIS.xlsx - UNIT PRICE ANALYSIS...

This preview shows page 1 - 3 out of 20 pages.

U PROJECT CONSTRUCTION OF A 10-STOREY SCHOOL BUILDING SAINT DOMINIC COLLEGE OF ASIA LOCATION Emilio Aguinaldo Highway, Bacoor, 4102 Cavite SUBJECT Material and Labor Estimate OWNER St. Dominic College of Asia ITEM NO. ITEM DESCRIPTION UNIT QUANTITY I. EARTHWORKS Equipment for 128 hrs. /hr 1.0 Mobilization (bank houses) 1.0 Excavation and Trimming works /lot 1.0 Foreman for 16 days /day 1.0 SUBTOTAL II. CONCRETE WORKS A. Cast-in-place concrete Ready mixed concrete cu.m. 2,255.0 Pump crete & other Equipment 1.0 B Steel Reinforcement Deformed bar 32 mm x 7.5 m. pcs 38.0 Deformed bar 25 mm x 7.5 m. pcs 1,782.0 Deformed bar 25 mm x 6.0 m. pcs 6,799.0 Deformed bar 20 mm x 7.5 m. pcs 98.0 Deformed bar 20 mm x 6.0 m. pcs 1,278.0 Deformed bar 16 mm x 7.5 m. pcs 462.0 Deformed bar 16 mm x 6.0 m. pcs 3,322.0 Deformed bar 12 mm x 6.0 m. pcs 5,105.0 Deformed bar 10 mm x 7.5 m. pcs 8,540.0 Deformed bar 10 mm x 6.0 m. pcs 18,688.0 GI tie wire # 16 (25 kgs.) rolls 198.0 C Metal Decking Metal Decking l.m. 5,665.0 SUBTOTAL III. MASONRY AND TILE WORKS CHB 4'' pcs. 47,191.0 CHB 6'' pcs. 40,850.0 Vitrified tiles 0.60 x 0.60 m. pcs. 11,182.0 Vitrified tiles 0.30 x 0.30 m. pcs. 4,720.0 Glazed tiles 0.30 x 0.30 m. pcs. 17,500.0 Non slip stair tiles 0.30 x 0.30 m. pcs. 1,890.0 Glazed tiles 0.20 x 0.30 m. pcs. 1,890.0 Unglazed ceramic tiles 0.30 x 0.30 m. pcs. 950.0 Vinyl tiles 0.30 x 0.30 m. pcs. 31,500.0 Tile adhesive bags 2,600.0 Tile grout bags 120.0 Rugby gals 139.0
Image of page 1
Portland Cement bags 9,850.0 Sand cu.m. 690.0 Deformed bar 10 mm x 6.0 m. pcs. 4,845.0 GI tie wire # 16 kgs. 135.0 SUBTOTAL IV. CARPENTRY WORKS A. Formworks Marine plywood 1/2'' pcs. 2,020.0 Coco lumber 2'' x 3'' x 12' pcs. 3,500.0 Coco lumber 2'' x 4'' x 12' pcs. 3,000.0 Scaffoldings lot. 1.0 Assorted CWN boxes 60.0 B. Ceiling Works Marine plywood 1/4'' pcs. 220.0 Assorted nail boxes 2.0 Comeza 1'' x 3'' x 12' pcs. 69.0 Good lumber 2'' x 2'' x 12' pcs. 480.0 Good lumber 2'' x 3'' x 12' pcs. 320.0 SUBTOTAL V. MISCELLANEOUS WORKS A. Doors D-1 40 mm. thk. Flush steel door sets 3.0 with epoxy paint finish on both sides. D-2 40 mm. thk. Flush type hollow sets 20.0 core wood door with 6mm. thk. marine plywood on both sides with qde paint fin D-3 40 mm. thk. Flush type hollow sets 144.0 core wood door with 6mm. thk. marine plywood on both sides with door viewer D-4 40 mm. thk. Flush steel door sets 10.0 with epoxy paint finish on both sides. B. Windows W-1 6 mm. fixed clear window sets 53.0 on aluminum frame with powder coated finish.
Image of page 2
Image of page 3

You've reached the end of your free preview.

Want to read all 20 pages?

  • Spring '18
  • Maam Divina
  • Paint thinner

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture