CEE3770_Sum09_PracticeTest2

CEE3770_Sum09_PracticeTest2 - CEE 3770 - Summer 2009...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
CEE 3770 - Summer 2009 Practice Test 2 June 30, 2009 (12:00 p.m. - 1:45 p.m.) Do not read any page other than this instruction sheet before the official start time. Be sure to write your name on EVERY page! Please use the space provided to answer your questions. Use the back of each page if you need extra room. Do not attach any extra sheets. Exam is closed book. You are not allowed to use notes or textbooks. You are allowed to use a calculator, but you may not share it with anyone else. Please refer to the last pages for the standard normal distribution and t-distribution tables. 1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Name: 1. (10 points) Suppose that b θ 1 and b θ 2 are estimators of the parameter θ . We know that E [ b θ 1 ] = θ and E [ b θ 2 ] = θ/ 2, V ar [ b θ 1 ] = 10 and V ar [ b θ 2 ] = 4. Which estimator is better? In what sense is it better? 2
Background image of page 2
Name: 2. (18 points) A civil engineer is analyzing the compressive strength of concrete. Compressive strength is approximately normally distributed with a variance σ 2 = 1000( psi ) 2 . A random sample of 12 specimens has a mean compressive strength of X = 3250 psi. (a) Construct a 95% two-sided confidence interval on mean compressive strength. (b) Construct a 99% two-sided confidence interval on mean compressive strength. Compare the width of this confidence interval with the width of the one found in part (a) 3
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Name: 3. (24 points) Samples of 50 parts from a metal punching process are selected every hour. Typically, 1% of parts require re-work. Let X be the number of parts in the sample of 50 that require re-work. A process problem is suspected if X exceeds its mean by more than three standard deviations. (a) What is the exact distribution for X . Find its expectation and variance (or/and standard deviation) (b) For what values of X we would suspect that the process may have a problem? Keep in mind that X is integer valued. (c) Find an approximation for the probability that in the next-hour batch of 50 parts, the
Background image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 06/29/2009 for the course CEE 3770 taught by Professor Staff during the Spring '08 term at Georgia Institute of Technology.

Page1 / 9

CEE3770_Sum09_PracticeTest2 - CEE 3770 - Summer 2009...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online