Topic 4 - Job Costing -Update

Topic 4 - Job Costing -Update - 1 1 Answer - Quick Check 9...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 1 1 Answer - Quick Check 9 (1) Job WR53 at NW Fab, Inc. required $200 of direct materials and 10 direct labour hours at $15 per hour. Estimated total overhead for the year was $760,000 and estimated direct labour hours were 20,000. What would be recorded as the cost of job WR53? a. $200. b. $350. c. $380. d. $730. Job WR53 at NW Fab, Inc. required $200 of direct materials and 10 direct labour hours at $15 per hour. Estimated total overhead for the year was $760,000 and estimated direct labour hours were 20,000. What would be recorded as the cost of job WR53? a. $200. b. $350. c. $380. d. $730. Pred. ovhd. rate $760,000/20,000hours $38 Direct materials $200 Direct labor $15 x 10 hours $150 Manufacturing overhead $38 x 10 hours $380 Total cost $730 Pred. ovhd. rate $760,000/20,000hours $38 Direct materials $200 Direct labor $15 x 10 hours $150 Manufacturing overhead $38 x 10 hours $380 Total cost $730 2 Answer - Quick Check 9 (2) Job WR53 at NW Fab, Inc. required $200 of direct materials and 10 direct labour hours at $15 per hour. Estimated total overhead for the year was $760,000 and estimated direct...
View Full Document

This note was uploaded on 07/07/2009 for the course ACCT 2102 taught by Professor Unknown during the Three '08 term at Queensland.

Page1 / 2

Topic 4 - Job Costing -Update - 1 1 Answer - Quick Check 9...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online