Homework2_Linear Programming_rev

Homework2_Linear Programming_rev - 311 Operations...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
1 311 Operations Management Fall 2008 Homework # 2 – Linear Programming 1. (40 points) Solve the following LPs manually. a. (20 points) Question 1 on page 53 of the textbook. Do not use Excel. Show your graph. Show your work. b. (20 points) Question 2 on page 53 of the textbook. Do not use Excel. Show your graph. Show your work. 2. (30 points) A firm that assembles computers and computer equipment is about to start production of two new types of microcomputers. Each type will require assembly time, inspection time, and storage space. The amounts of each of these resources that can be devoted to the production of the microcomputers are limited. The manager of the firm would like to determine the quantity of each microcomputer to produce in order to maximize the profit generated by sales of these microcomputers. In order to develop a suitable model of the problem, the manager has met with design and manufacturing personnel. As a result of those meetings, the manager has obtained the following information:
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 07/21/2009 for the course BUAD 311T taught by Professor Vaitsos during the Fall '07 term at USC.

Page1 / 2

Homework2_Linear Programming_rev - 311 Operations...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online