Dependent_Demand - Dependent Demand Requirements Planning Systems-1 Michigan State University 2004 2008 Critical Terminology Independent vs

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Dependent Demand Requirements Planning Systems -1- Michigan State University, 2004 2008 Critical Terminology Independent vs. dependent demand. MRP: Materials requirements planning. Master production schedule. BOM: Bill of materials. Inventory records file. Inventory netting. -2- Michigan State University, 2004 2008 Production Planning Sales and operations planning Forecasts Firm orders Aggregate Plan Master production schedule Inventory records Bills of material MRP System Capacity planning -3 Michigan State University, 2004 2008 Planned purchase orders Planned production orders Exception reports Creating the BOM Gibson Guitar(1) Strings Set (1) Level 2 Wood(1) Fret Set(1) Top(1) Back(1) Sides(2) Hardware(1) Level 0 Neck (1) Level 1 Body (1) Blank (1) Blank (2) -4- Michigan State University, 2004 2008 Inventory Netting Part Guitar -Neck -Wood -Hardware -Strings -Body -Top Gross Requirements 5 2 1 1 2 2 2 Inventory 3 1 0 0 2 0 1 Net Requirements 2 1 1 1 0 2 1 -Back -Sides(2) -Hardware -5 Michigan State University, 2004 2008 2 4 (or 2x2) 2 0 0 1 2 4 1 A Dependent Demand Problem End Item A is made by assembling 2 of Part B and 1 of Part C. Part B is made from 2 of component D and 2 of component E. Gross requirements for End Item A are 10 units. There exists in inventory 5 units of End item A. There are currently 2 units of Part B in inventory, 6 units of component D, and 4 units of E in inventory. There are 2 units of Part C in inventory. What are the net requirements for Item A, Parts B and C, and components D and E? -6- Michigan State University, 2004 2008 ...
View Full Document

This note was uploaded on 08/11/2009 for the course MSC 303 taught by Professor Cooper during the Spring '08 term at Michigan State University.

Page1 / 6

Dependent_Demand - Dependent Demand Requirements Planning Systems-1 Michigan State University 2004 2008 Critical Terminology Independent vs

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online