supp10pp - Practice Problems: Supplement 10 (S10), Work...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Practice Problems: Supplement 10 (S10), Work Measurement Problem 1: Carolyn Barrett, a marketing surveyor, takes an average of 10 minutes to complete a particular questionnaire. Carolyn’s performance rating (pace) is 110% and there is an allowance of 15%. What is the Normal time for completing this questionnaire? What is the Standard time for completing this questionnaire? Problem 2: Tom Leonard, of Leonard, Spitz, and Wareham, takes 3 hours and 25 minutes to write an end of month report. Tom is rated at 95% (work pace is 95%) and the office has a personal time allowance of 8%. There is no delay time or fatigue time. What is the Normal time for writing an end of month report? What is the Standard time for writing an end of month report? Problem 3: The two steps in preparing chocolate candy bars are molding and packaging. Personal fatigue and delay allowances are set at 15%. The molding machine operator is rated at 110% and the packer is rated at 80%. Observed times per batch are given below.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 5

supp10pp - Practice Problems: Supplement 10 (S10), Work...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online