Ch14pp - Practice Problems Chapter 14 Material Requirements Planning(MRP and ERP Problem 1 The Hunicut and Hallock Corporation makes two versions

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Practice Problems: Chapter 14, Material Requirements Planning (MRP) and ERP Problem 1: The Hunicut and Hallock Corporation makes two versions of the same basic file cabinet, the TOL (Top-of-the-line) five drawer file cabinet and the HQ (High-quality) five drawer filing cabinet. The TOL and HQ use the same cabinet frame and locking mechanism. The drawer assemblies are different although both use the same drawer frame assembly. The drawer assemblies for the TOL cabinet use a sliding assembly that requires four bearings per side whereas the HQ sliding assembly requires only two bearings per side. (These bearings are identical for both cabinet types.) 100 TOL and 300 HQ file cabinets need to be assembled in week #10. No current stock exists. Develop a material structure tree for the TOL and the HQ file cabinets. Problem 2: Develop a gross material requirements plan for the TOL and HQ cabinets in the previous example. Problem 3:
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 08/22/2009 for the course OPER 1401 taught by Professor Robshepherd during the Fall '05 term at Niagara College.

Page1 / 7

Ch14pp - Practice Problems Chapter 14 Material Requirements Planning(MRP and ERP Problem 1 The Hunicut and Hallock Corporation makes two versions