Lab-AET210_Fall06-2

Lab-AET210_Fall06-2 - 1. Following the method of least...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
AET210 Fall 2006 Lab 2: Wind Tunnel Velocity Calibration RPM vs Velocity Data Tunnel test section cross section is square with 17.75 inches sides. Density of air=1.225 kg/m 3 RPM Velocity (m/sec) 400 3.494 500 4.941 600 5.705 700 6.690 800 8.068 900 9.020 1000 9.881 1100 11.047 1200 11.933 1300 13.071 1400 14.119 1500 15.094 1600 15.882 1700 16.510 1700 16.571 1600 15.946 1500 15.094 1400 14.119 1300 13.146 1200 12.100 1100 11.141 1000 9.981 900 8.975 800 7.889 700 6.840 600 5.776 500 4.510 400 3.551
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 1. Following the method of least squares, calculate the coefficients of a straight line fit to the data 2. Plot the line from Step (1) above 3. Determine the velocities for a tunnel speed setting of 850 RPM, 1150 RPM and 1650 RPM 4. Calculate the mass flow rate through the tunnel test section for the settings of Step (2) above. 5. Write a formal lab report – due on Wednesday, 10-11-2006....
View Full Document

This note was uploaded on 08/25/2009 for the course AET AET210 taught by Professor Rajadas during the Spring '06 term at ASU.

Ask a homework question - tutors are online