Final Exam Review 2009

Final Exam Review 2009 - ECIV 341 Construction Scheduling...

Info iconThis preview shows pages 1–9. Sign up to view the full content.

View Full Document Right Arrow Icon
ECIV 341 Construction Scheduling & Estimating FINAL EXAM REVIEW Class 14: 4/21/09
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Presentation 7 Activity Network Development 2 Critical Path The sequence of project network activities with the longest overall duration which determines the shortest time possible to complete the project
Background image of page 2
Presentation 7 Activity Network Development 3 Activity Logic Sequential (Predecessor / Successor) Concurrent Multiple Successor Multiple Predecessor Combinational
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Conceptual Cost Estimates Cost Indices Costs based on historical data of a similar project at a different location and a different time. Presentation 2, Slide 8
Background image of page 4
Acronyms NIC: Not in Contract NTS: Not to Scale FOB: Free on Board (Freight on Board) PDM: Precedence Diagram Method QTO: Quantity Take Off SFCA: Square Foot of Contact Area SOG: Slab on Grade UL: Underwriters Laboratory NEMA: National Electrical Manufactures Association National Electric Code NEC:
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Construction Equipment Identification
Background image of page 6
Verbal conversion of feet and inches to decimals of a foot Verbal conversion of decimals of a foot to feet and inches
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
EQUIPMENT COSTS Direct Equipment: Equipment used specifically for an individual activity (Example: Concrete Pump on wall placement) Indirect Equipment: Equipment used for a variety of activities throughout the project (Example: Jobsite forklift or a general purpose crane) Presentation 13 Slide 7
Background image of page 8
Image of page 9
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 22

Final Exam Review 2009 - ECIV 341 Construction Scheduling...

This preview shows document pages 1 - 9. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online