Presentation 13 1 CHAPTER 8: PRICING SELF PERFORMED WORK CHAPTER 9: ESTIMATING SUBCONTRACTOR WORK CHAPTER 10: ESTIMATING GENERAL CONDITIONS CHAPTER 11: COMPLETING THE ESTIMATE
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Presentation 13 2 1. Request, Collect and Review Information 2. Determine your Estimating Strategy 3. Perform QTO / Price out Recapitulation Sheets 4. Line-up Subcontractors 5. Develop a Summary Schedule 6. Price General Conditions 7. Receive Subcontractor and Material Quotes 8. Totalize all Recapitulation Sheets. 9. Complete Bid Forms and Submit Bid. ESTIMATE ACTIVITIES
Background image of page 2
Presentation 13 3 CHAPTER 8: PRICING SELF PERFORMED WORK Recapitulation follows the QTO process. Recap sheet summarizes the quantified data, applies pricing factors and calculates the costs of that portion or type of work.
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Presentation 13 4 RECAP SHEETS INCLUDE Material quantities and costs Labor hours and costs Direct Equipment hours and costs
Background image of page 4
Presentation 13 5 LABOR COSTS Prevailing Wage Law Certified Payroll
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Presentation 13 6 LABOR COSTS Can be applied as an average for all trades. Can be applied individually to each trade and activity. Can be applied as an average for a crew on a particular activity.
Background image of page 6
Presentation 13 7 EQUIPMENT COSTS Direct Equipment: Equipment used specifically for an individual activity (Example: Concrete Pump on wall placement) Indirect Equipment: Equipment used for a variety of activities throughout the project (Example: Jobsite forklift or a general purpose crane)
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Presentation 13 8 CHAPTER 9: ESTIMATING SUBCONTRACTOR WORK General Contractors Options for Pricing Specific Work which may be Subcontracted Out: 1.) Solicit bids to Subcontractors, receive bids prior to bid opening and incorporate lowest bidders cost into bid.
Background image of page 8
Presentation 13 9 General Contractors Options for Pricing
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 10
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 08/30/2009 for the course ECIV 341 taught by Professor Cybulski during the Spring '09 term at Case Western.

Page1 / 31

Pres 13 Completing the Estimate - 1 CHAPTER 8: PRICING SELF...

This preview shows document pages 1 - 10. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online