HW12_sol - E160 Operations Research I Fall 2008 Homework...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
E160 Operations Research I Fall 2008 Homework #13 Solution Section 8.3 Problem 6 If the maximum flow = 21, then all packages can be loaded. Problem 8: See figure.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Problem 16 All arcs from month i workers to Project j have a capacity of 6. All projects can be completed if and only if the maximum flow from source to sink equals 30. Section 8.5 Problem 4 a) All arcs have infinite capacity Arc Shipping Cost Bos-Chic 800 + 80 = $880 Bos-Austin 800 + 220 = $1,020 Bos-LA 800 + 280 = $1,080 Ral-Chic 900 + 100 = $1,000
Background image of page 2
Ral-Aus 900 + 140 = $1,040 Ral-LA 900 + 170 = $1,070 Chic-Aus $40 Chic-LA $50 Problem is balanced so no Dummy Point is needed City Net Outflow Boston 400 Raleigh 300 Chicago 0 LA -400 Austin -300 Problem 4b If at most 200 units can be shipped through Chicago, we must add a node Chicago'. Delete the Raleigh-Chicago and Boston- Chicago arcs and insert the following arcs Arc Shipping Cost Arc Capacity Boston-Chicago' $880 Raleigh-Chicago' $1000 Chicago-Chicago' 0 200 Review Section Problem 4
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 09/06/2009 for the course IEOR 160 taught by Professor Hochbaum during the Spring '07 term at Berkeley.

Page1 / 7

HW12_sol - E160 Operations Research I Fall 2008 Homework...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online