FLOW NET CONSTRUCTION

FLOW NET CONSTRUCTION - FLOW NET CONSTRUCTION LABORATORY...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
FLOW NET CONSTRUCTION LABORATORY No. 9 ROB WYMAN 04/08/2008
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
April 8 th  , 2008 Mark Bell, P.E. Project Manager AGC Engineering Cleveland, OH 44120 Subject: Report of Relative Density Determination Cleveland, Ohio Dear Mr. Bell: I have completed the Flow Net Construction laboratory.  I have attached the flow net  calculations with the designed graph. After further calculations, I found that the seepage rate is 1.2075 E-6 ft 2 /s or 1.734 E -4  in 2 /s.  I found very little error in our calculations and any error is described in the results  section of this laboratory paper. Sincerely, Rob Wyman
Background image of page 2
Cover Letter . . . . . . . . . .       2 Introduction and Objectives . . . . . . . .       4 Experimental Equipment . . . . . . . 4 Experimental Procedure . . . . . . . .       4 Experimental Results and Interpretation . . . . . .       5
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 09/08/2009 for the course ECIV 330 taught by Professor Yu during the Spring '08 term at Case Western.

Page1 / 7

FLOW NET CONSTRUCTION - FLOW NET CONSTRUCTION LABORATORY...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online