Fig8-19 - Project Selection Analysis TMC Corporation...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
Project Selection Analysis Page 1 Select? Engineers Linking Probability Prob. of NPV if Expected Project (1=y, 0=n) Assigned Constraints Parameter Success Successful NPV 1 1 5 -20 3.1 0.6173 $750.00 $462.96 2 1 5 -20 2.5 0.6667 $120.00 $80.00 3 1 5 -20 4.5 0.5263 $900.00 $473.68 4 1 5 -20 5.6 0.4717 $400.00 $188.68 5 0 0 0 8.2 0.0000 $1,100.00 $0.00 6 1 5 -20 8.5 0.3704 $800.00 $296.30 Total Used 25 Total $1,501.62 Total Available 25 Start-up Funds Available verkkeers doen weer TMC Corporation Maximize: H13 By changing: B7:C12 Subject to: C13<=C14 I13<=I14 D7:D12<=0 B7:B12 binary C7:C12>=0 and in
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Project Selection Analysis Page 2 Start-up Cost $325.00 $200.00 $490.00 $125.00 $710.00 $240.00 $1,380.00 $1,700.00 nteger
Background image of page 2
Probability Data Page 3 Probability Parameter 3.1 2.5 4.5 5.6 8.2 8.5 Engineers Project 1 Project 2 Project 3 Project 4 Project 5 Project 6 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.2439 0.2857 0.1818 0.1515 0.1087 0.1053 2 0.3922 0.4444 0.3077 0.2632 0.1961 0.1905 3 0.4918 0.5455
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 4

Fig8-19 - Project Selection Analysis TMC Corporation...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online