Fig6-25 - Cement Contract Report M inimize G17 By changing...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Cement Contract Report M inimize: G17 By changing: B12:E14 Cost Per Delivered Ton B21:E21 Project 1 Project 2 Project 3 Project 4 B26:E26 Company 1 $120 $115 $130 $125 B31:D31 Company 2 $100 $150 $110 $105 Subject t o: F12:F14<=G12:G14 Company 3 $140 $95 $145 $165 B15:E15>=B16:E16 Amount to Purchase B22:E22<=0 Project 1 Project 2 Project 3 Project 4 Supplied Available B23:E23>=0 Company 1 0 0 0 0 0 525 Company 2 0 0 0 0 0 450 B27:E27<=0 Company 3 0 0 0 0 0 550 E28<=1 Received 0 0 0 0 D32=0 Needed 450 275 300 350 D33<=1 Total Cost: $0 B21:E21 binar y Additional Constraints Follow: B26:E26 binar y Co. 1 Batch-Size 150 B31:D31 binar y Binary Variables 0 0 0 0 B12:E14>=0 Linking Constraints 0 0 0 0 (<= 0) Batch Constraints 0 0 0 0 (>= 0) B&G Construction Co. 2 Max Supply 200 Binary Variables 0 UB Constraints -200 Sum of Binary Variables Co. 3 Tot. Supply 200 Binary Variables 0 Tot. Supply = 0, 200, 400, 550 Sum of Binary Variables 0 -200 400 0 0 -200 550 0 0.00 0 0 -200 0 (<= 0) (<= 1) (=0) (<=1) Page 1 Cement Contract Report G17 ng: B12:E14 1:E21 6:E26 1:D31 F12:F14<=G12:G14 5:E15>=B16:E16 2:E22<=0 3:E23>=0 7:E27<=0 8<=1 32=0 33<=1 1:E21 binar y 6:E26 binar y 1:D31 binar y 2:E14>=0 Page 2 ...
View Full Document

This note was uploaded on 09/13/2009 for the course ENGINEERIN 0130661848 taught by Professor Nel during the Spring '09 term at Stellenbosch University-South Africa.

Ask a homework question - tutors are online