homework 1

homework 1 - an addition. Be sure to submit both stapled...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
IE 343, Fall 2009 Homework #1 Due on Sep 9, 2009 Note: Make sure to show all working for the problems on your submission. Submit your homework with the ‘Answer Summary Sheet’ attached as the last page. This sheet can be found on Blackboard, together with the relevant homework. It contains a simple list of question numbers and blanks for the answers. The answers you arrive at in your working must match those that you provide in the answer summary sheet. If there are any discrepancies, your assignment will not be graded. The answer summary sheet is not a substitute for your normal submission, it is
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: an addition. Be sure to submit both stapled together, with your name and section written on both your work and the answer summary sheet. 1. Problem 2.4 (8 points) 2. Problem 2.12 (8 points) 3. Problem 2.14 (8 points) 4. Problem 2.15 (6 points) 5. Problem 2.17 (10 points) 6. Problem 2.25 (10 points) 7. By manufacturing x units of a product per day, a firm makes a profit of But the firm cannot manufacture more than 12 products a day. What is the optimal number of products that the firm should make every day? (10 points)...
View Full Document

This note was uploaded on 09/14/2009 for the course ENGR 126 taught by Professor Oakes during the Fall '08 term at Purdue.

Ask a homework question - tutors are online