Leo-part - Actual flow in our phases ClientsRequirement

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
In our flow, when we met client, design, mananger, cost, and safe issue, we jumped back one phases, two phases, or even three phases. In addition, each phases overlaid over another because we considered time, cost, and job distribution to meet our goal. Comparision with the seven phases life cycle Basic Engineering or Pre-Design Phase Construction Detail-Engineering or Design Phase Pre-Commissioning Commissioning Client’s Requirement Basic Engineering or Pre-Design Phase Construction Detail-Engineering or Design Phase Pre-Commissioning Commissioning Client’s Requirement Preliminary conceptual design Logical design & syst. architecture Logical design & syst. architecture spec’s spec’s Detailed design, production & Detailed design, production & testing testing Operational deployment Operational deployment
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 2

Leo-part - Actual flow in our phases ClientsRequirement

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online