ProjectInstructions2008

ProjectInstructions2008 - ISE310L Spring 2008 First Project...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
ISE310L Spring 2008 First Project, due 03/12/08 Project Grading There will be two team projects in the course. You can use the teams you had for the homework to date, or form new ones. Everyone must be on a team. The project grade will be divided into four categories: 1. Executive Summary 25% 2. Technical Accuracy and Completeness 30% 3. Creativity in Method and Solution 35% 4. Organization of report as a whole 10% For each category, you will be graded on a 1 - 12 scale, where 12 represents exceptional work, 9 represents average work, 6 represents passable but below average work, and 3 represents a substantial deficiency. The project grade will be a weighted average of the grades for the separate elements. A single group grade will be assigned for elements 2 - 4. The executive summary grade will be assigned on an individual basis, and each person in the group should turn in his/her own executive summary . Team members should not collaborate at all on their executive summaries.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 10/01/2009 for the course ISE 310L taught by Professor Bottlik during the Spring '06 term at USC.

Page1 / 3

ProjectInstructions2008 - ISE310L Spring 2008 First Project...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online