hw13 - Due date: 2/20 1 Due date: 2/20 For equilibrium: r r...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Due date: 2/20 1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Due date: 2/20 2 For equilibrium: 0 : ( ) 0 s FW P R = ++− = r r r rr r where R is the force of water on the face BD of the dam. From the force triangle,
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 10/07/2009 for the course ENGRD 2020 taught by Professor Zehnder during the Fall '06 term at Cornell University (Engineering School).

Page1 / 3

hw13 - Due date: 2/20 1 Due date: 2/20 For equilibrium: r r...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online