bcor2500ch4-audi

bcor2500ch4-audi - Them to Pull Info/Track (just like...

Info iconThis preview shows pages 1–7. Sign up to view the full content.

View Full Document Right Arrow Icon
Audi: Assembly Lines, Processes, and Simulation Objective: Building Cars to Specs / Every car “made on demand” Specs could be dimensions (by model, by body style, by drivetrain, by engine type, by color, etc.) / how many? Keep assembly line moving Avoid Bottlenecks Avoid Delays
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2 Delays Caused By: Lack of Needed Materials Inability to Contact Customers (suggest substitution or upgrade) Need to Coordinate Self-managing work crews, suppliers, transporters, labor unions, and chains of command
Background image of page 2
3 Simulate Actual Production Need to Know Processes and Order Need to Know Input to Processes (both materials and labor) Then Need to Know Desired Outputs Run Simulation as a Virtual Representation of Reality Conduct Line Performance Analysis
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
4 Reaction to Simulation Pull Cars From Line (50 gallons of crème paint meant…), Slow Down/Delay Production, Speed Up Change Labor Distribution Contact Customers if Needed or Allow
Background image of page 4
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 6
Background image of page 7
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Them to Pull Info/Track (just like packages) Corrective Actions thru Communication 5 Audis Solution Required: Operations data mart/over 50 dimensions and hundreds of measurements Database engine Front-end analysis software ETL (Data Transformation Services) Both operational/day-to-day AND long-term analysis needs 6 Future Plans (p. 72) Planned Results vs Actual Results to use Feedback to Change System (Both processes and inputs) Measure variances and uncover trends Added power in the marketplace with greater efficiency through better intelligence 7 Learning? Application of all concepts from data marts to front-end tools to increased trust through improved communication Benefits for customers, suppliers, workers, unions, government, through better efficiency and effectiveness Application to all assembly lines...
View Full Document

Page1 / 7

bcor2500ch4-audi - Them to Pull Info/Track (just like...

This preview shows document pages 1 - 7. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online