ME250 Design and Manufacturing I Winter 2009 Lecture HW #3b (30 points) Note: This is a team assignment to be done by your project team. All team members must contribute to the assignment. Below please provide name, UMID, signature, and date to declare each team member’s contribution. Name: _______________ UMID: ________ Signature: _____________ Date: _______ Name: _______________ UMID: ________ Signature: _____________ Date: _______ Name: _______________ UMID: ________ Signature: _____________ Date: _______ Name: _______________ UMID: ________ Signature: _____________ Date: _______ Name: _______________ UMID: ________ Signature: _____________ Date: _______
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
1. Gantt chart is a table where tasks are listed in the leftmost column in chronological order of start date and the duration of each task is indicated as a horizontal bar in the row corresponding to the task. An example Gantt chart created using Microsoft Project is shown below. Create a Gantt chart that covers the time period for your project. It should begin with
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 10/14/2009 for the course CHEM 130 taught by Professor Jadwigasipowska during the Fall '07 term at University of Michigan.

Page1 / 3

hw3b-team-1 - ME250 Design and Manufacturing I Winter 2009...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online