PROJECT DEADLINE = 52 IMMEDIATE PREDECESSORS ACTIVITY NODE NODE PREDECESSOR A A 15 85000 5 165000 D A B B 12 40000 6 100000 E B C C 20 90000 10 250000 F C D D 24 145000 16 315000 F E E E 10 100000 4 220000 G F F F 10.33 100000 6.2 200000 H G G G 10 200000 2 600000 I D H H 12 175000 6 475000 I H I I 11.5 287500 9.2 331200 J F J J 39 250000 12 450000 NORMAL TIME NORMAL COST CRASH TIME CRASH COST
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
CRASHING ANALYSIS TOTAL PROJECT COST ### PROJECT NORMAL COST 1472500 COMPLETION TIME 52 PROJECT CRASH COST 3106200 ACTIVITY NODE Total Cost A A 15 0 15 0 0 85000 B B 6 0 6 6 60000
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 100000 C C 14.6 14.6 5.4 86400 176400 D D 24 18.8 42.8 145000 E E 8.6 6 14.6 1.4 28000 128000 F F 6.2 14.6 20.8 4.13 100000 200000 G G 10 20.8 30.8 200000 H H 12 30.8 42.8 175000 I I 9.2 42.8 52 2.3 43700 331200 J J 31.2 20.8 52 7.8 57777.78 307777.78 Completion Time Start Time Finish Time Amount Crashed Cost of Crashing...
View Full Document

Page1 / 2

Case 5.1-MS - 100000 C C 14.6 14.6 5.4 86400 176400 D D 24...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online