Case 5.1-QM - 6 6 60000 100000 C C 14.6 14.6 5.4 86400...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
PROJECT DEADLINE = 52 IMMEDIATE PREDECESSORS ACTIVITY NODE NODE PREDECESSOR A A 15 85000 5 165000 D A B B 12 40000 6 100000 E B C C 20 90000 10 250000 F C D D 24 145000 16 315000 F E E E 10 100000 4 220000 G F F F 10.33 100000 6.2 200000 H G G G 10 200000 2 600000 I D H H 12 175000 6 475000 I H I I 11.5 287500 9.2 331200 J F J J 40 150000 20 350000 NORMAL TIME NORMAL COST CRASH TIME CRASH COST
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
CRASHING ANALYSIS TOTAL PROJECT COST 1778600 PROJECT NORMAL COST 1372500 COMPLETION TIME 52 PROJECT CRASH COST 3006200 ACTIVITY NODE Total Cost A A 15 0 15 0 0 85000 B B 6
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 6 6 60000 100000 C C 14.6 14.6 5.4 86400 176400 D D 24 18.8 42.8 145000 E E 8.6 6 14.6 1.4 28000 128000 F F 6.2 14.6 20.8 4.13 100000 200000 G G 10 20.8 30.8 200000 H H 12 30.8 42.8 175000 I I 9.2 42.8 52 2.3 43700 331200 J J 31.2 20.8 52 8.8 88000 238000 Completion Time Start Time Finish Time Amount Crashed Cost of Crashing...
View Full Document

Page1 / 2

Case 5.1-QM - 6 6 60000 100000 C C 14.6 14.6 5.4 86400...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online