Case 5.3-Sug 3 - ACTIVITY TIMES 3-TIME ESTIMATE Activity VP...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
ACTIVITY TIMES IMMEDIATE 3-TIME ESTIMATE PREDECESSORS Activity Node a m b μ σ Node Predecessor VP fo Europe A 0 0 C A Menu Consultant B 0 0 D C District C 0 0 E D Site Location D 0 0 F A Lease E 5 0.17 G E Store Layout F 0 0 G F Construct Store G 71 5.67 H B Develop Recipes H 0 0 I H Test Recipes I 0 0 J F Purchase Equipment J 4.5 0.83 J I Design Accessories K 16.5 1.5 K F Purchase Supplies L 20 2.67 K I Training Program M 25 4.67 L K Train Employees N 11 1.67 M J Advertising Agency O 19.5 2.5 M K Marketing Program P 51 6 N M Advertising Space Q 5 0.33 O A Install Signs R 6 1 P D P O Q P R G R Q KNOWN μ and σ
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
CRITICAL PATH ANALYSIS MEAN 82 STANDARD DEVIATION* 5.76 * Assumes all critical activities are on one critical path VARIANCE* 33.14 PROBABILITY COMPLETE BEFORE 64 = 0.000884 Acitivty Node Critical μ σ ES EF LS LF Slack VP fo Europe A * 0 0 0 0 0 0 0 0 Menu Consultant B 0 0 0 0 0 29.5 29.5 29.5 District C * 0 0 0 0 0 0 0 0 Site Location D * 0 0 0 0 0 0 0 0 Lease E * 5 0.17 0.03 0 5 0 5 0 Store Layout F 0 0 0 0 0 5 5 5 Construct Store G * 71 5.67 32.11 5 76 5 76 0 Develop Recipes H 0 0 0 0 0 29.5 29.5 29.5 Test Recipes I 0 0 0 0 0 29.5
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 2

Case 5.3-Sug 3 - ACTIVITY TIMES 3-TIME ESTIMATE Activity VP...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online