Ch5.7 - ACTIVITY TIMES 3-TIME ESTIMATE Activity Addresses...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
ACTIVITY TIMES IMMEDIATE 3-TIME ESTIMATE PREDECESSORS Activity Node a m b μ σ Node Predecessor Addresses A 20 25 50 C B Budget B 3 5 12 D B Choose Site C 10 14 21 F A Hire Band D 5 14 18 F C Sweatshirts E 10 10 14 G B Announcements F 8 14 25 H D Photographer G 3 4 7 H F Excess Funds H 32 40 50 H G Door Prizes I 2 5 8 I E I H KNOWN μ and σ
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
CRITICAL PATH ANALYSIS MEAN 88.5 STANDARD DEVIATION* 6.56 * Assumes all critical activities are on one critical path VARIANCE* 43.03 PROBABILITY COMPLETE BEFORE 90 = 0.590439 Acitivty Node Critical μ σ ES EF LS LF Slack Addresses A * 28.33 5 25 0 28.33 0 28.33 0 Budget B 5.83 1.5 2.25 0 5.83 8 13.83 8 Choose Site C 14.5 1.83 3.36 5.83
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 10/15/2009 for the course MGT mgt taught by Professor Tannous during the Spring '09 term at University of Houston - Downtown.

Page1 / 2

Ch5.7 - ACTIVITY TIMES 3-TIME ESTIMATE Activity Addresses...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online