Ch5.8b - NODE Total Cost A A 4 4 4 600 5400 B B 4 11 15 3...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
PROJECT DEADLINE = 15 IMMEDIATE PREDECESSORS ACTIVITY NODE NODE PREDECESSOR A A 8 4800 4 5400 B C B B 7 3900 4 4800 B E C C 7 5100 2 6600 C A D D 4 1200 2 2400 D G E E 9 3600 3 4800 E A F F 9 3300 3 6000 F C G G 7 2700 3 3900 F D G A NORMAL TIME NORMAL COST CRASH TIME CRASH COST
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
CRASHING ANALYSIS TOTAL PROJECT COST 29950 PROJECT NORMAL COST 24600 COMPLETION TIME 15 PROJECT CRASH COST 33900 ACTIVITY
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: NODE Total Cost A A 4 4 4 600 5400 B B 4 11 15 3 900 4800 C C 7 4 11 5100 D D 4 7 11 1200 E E 7 4 11 2 400 4000 F F 4 11 15 5 2250 5550 G G 3 4 7 4 1200 3900 Completion Time Start Time Finish Time Amount Crashed Cost of Crashing...
View Full Document

This note was uploaded on 10/15/2009 for the course MGT mgt taught by Professor Tannous during the Spring '09 term at University of Houston - Downtown.

Page1 / 2

Ch5.8b - NODE Total Cost A A 4 4 4 600 5400 B B 4 11 15 3...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online